A platform for research: civil engineering, architecture and urbanism
CONNECTION MEMBER, ALC BATTEN MOUNTING NODE STRUCTURE, AND FABRICATED MOUNTING METHOD
The present invention relates to the technical field of building construction, and provides a connection member, an ALC batten mounting node structure, and a fabricated mounting method. The connection member comprises a connection part, a first pipe clamp, and a second pipe clamp, wherein the connection part comprises a first connection segment and a second connection segment; the first pipe clamp and the second pipe clamp are respectively perpendicular to the first connection segment, and symmetrically arranged on two opposite sides of the first connection segment; and the second connection segment is bent towards one side of the first connection segment. According to the ALC batten mounting node structure having the connection member, the first connection segment is located between a first ALC batten and a second ALC batten which are adjacent; the first pipe clamp is embedded in the first ALC batten; the second pipe clamp is embedded in the second ALC batten; the second connection segment is used for connecting steel beams, achieves the effect of using the connection member on a node position for simultaneously fixing the two adjacent ALC battens, enables fixation to be firm, and enables a mounting process to be convenient. The fabricated mounting method based on the ALC batten mounting node structure can achieve sequential mounting of the ALC battens.
La présente invention se rapporte au domaine technique de la construction de bâtiment, et concerne un élément de raccordement, une structure de nœud de montage de tasseau ALC, et un procédé de montage fabriqué. L'élément de raccordement comprend une partie de raccordement, un premier collier de serrage de tuyau et un second collier de serrage de tuyau. La partie de raccordement comprend un premier segment de raccordement et un second segment de raccordement ; le premier collier de serrage de tuyau et le second collier de serrage de tuyau sont respectivement perpendiculaires au premier segment de raccordement, et disposés symétriquement sur deux côtés opposés du premier segment de raccordement ; et le second segment de raccordement est plié vers un côté du premier segment de raccordement. Selon la structure de nœud de montage de tasseau ALC ayant l'élément de raccordement, le premier segment de liaison est situé entre un premier tasseau ALC et un second tasseau ALC adjacents ; le premier collier de serrage de tuyau est incorporé dans le premier tasseau ALC ; le second collier de serrage de tuyau est incorporé dans le second tasseau ALC ; le second segment de raccordement est utilisé pour relier des poutres en acier, permet d'obtenir l'effet d'utilisation de l'élément de raccordement sur une position de nœud pour fixer simultanément les deux tasseaux ALC adjacents, permet la fixation à être ferme, et permet à un processus de montage d'être pratique. Le procédé de montage fabriqué sur la base de la structure de nœud de montage de tasseau ALC permet de réaliser un montage séquentiel des tasseaux ALC.
本发明涉及建筑施工技术领域,提供了一种连接件、ALC条板安装节点结构及装配式安装方法,连接件包括连接部、第一管卡和第二管卡,连接部包括第一连接段和第二连接段,第一管卡和第二管卡分别垂直于第一连接段,并对称设置在第一连接段相对的两侧,第二连接段向第一连接段的一侧弯折,具有该连接件的ALC条板安装节点结构,第一连接段位于相邻ALC条板第一ALC条板和第二ALC条板之间,第一管卡嵌入第一ALC条板中,第二管卡嵌入第二ALC条板中;第二连接段用于连接钢梁,实现一个节点处的连接件同时固定相邻两块ALC条板,使固定更加牢固,安装过程更加方便,基于该ALC条板安装节点结构的装配式安装方法能够实现ALC条板的顺序式安装。
CONNECTION MEMBER, ALC BATTEN MOUNTING NODE STRUCTURE, AND FABRICATED MOUNTING METHOD
The present invention relates to the technical field of building construction, and provides a connection member, an ALC batten mounting node structure, and a fabricated mounting method. The connection member comprises a connection part, a first pipe clamp, and a second pipe clamp, wherein the connection part comprises a first connection segment and a second connection segment; the first pipe clamp and the second pipe clamp are respectively perpendicular to the first connection segment, and symmetrically arranged on two opposite sides of the first connection segment; and the second connection segment is bent towards one side of the first connection segment. According to the ALC batten mounting node structure having the connection member, the first connection segment is located between a first ALC batten and a second ALC batten which are adjacent; the first pipe clamp is embedded in the first ALC batten; the second pipe clamp is embedded in the second ALC batten; the second connection segment is used for connecting steel beams, achieves the effect of using the connection member on a node position for simultaneously fixing the two adjacent ALC battens, enables fixation to be firm, and enables a mounting process to be convenient. The fabricated mounting method based on the ALC batten mounting node structure can achieve sequential mounting of the ALC battens.
La présente invention se rapporte au domaine technique de la construction de bâtiment, et concerne un élément de raccordement, une structure de nœud de montage de tasseau ALC, et un procédé de montage fabriqué. L'élément de raccordement comprend une partie de raccordement, un premier collier de serrage de tuyau et un second collier de serrage de tuyau. La partie de raccordement comprend un premier segment de raccordement et un second segment de raccordement ; le premier collier de serrage de tuyau et le second collier de serrage de tuyau sont respectivement perpendiculaires au premier segment de raccordement, et disposés symétriquement sur deux côtés opposés du premier segment de raccordement ; et le second segment de raccordement est plié vers un côté du premier segment de raccordement. Selon la structure de nœud de montage de tasseau ALC ayant l'élément de raccordement, le premier segment de liaison est situé entre un premier tasseau ALC et un second tasseau ALC adjacents ; le premier collier de serrage de tuyau est incorporé dans le premier tasseau ALC ; le second collier de serrage de tuyau est incorporé dans le second tasseau ALC ; le second segment de raccordement est utilisé pour relier des poutres en acier, permet d'obtenir l'effet d'utilisation de l'élément de raccordement sur une position de nœud pour fixer simultanément les deux tasseaux ALC adjacents, permet la fixation à être ferme, et permet à un processus de montage d'être pratique. Le procédé de montage fabriqué sur la base de la structure de nœud de montage de tasseau ALC permet de réaliser un montage séquentiel des tasseaux ALC.
本发明涉及建筑施工技术领域,提供了一种连接件、ALC条板安装节点结构及装配式安装方法,连接件包括连接部、第一管卡和第二管卡,连接部包括第一连接段和第二连接段,第一管卡和第二管卡分别垂直于第一连接段,并对称设置在第一连接段相对的两侧,第二连接段向第一连接段的一侧弯折,具有该连接件的ALC条板安装节点结构,第一连接段位于相邻ALC条板第一ALC条板和第二ALC条板之间,第一管卡嵌入第一ALC条板中,第二管卡嵌入第二ALC条板中;第二连接段用于连接钢梁,实现一个节点处的连接件同时固定相邻两块ALC条板,使固定更加牢固,安装过程更加方便,基于该ALC条板安装节点结构的装配式安装方法能够实现ALC条板的顺序式安装。
CONNECTION MEMBER, ALC BATTEN MOUNTING NODE STRUCTURE, AND FABRICATED MOUNTING METHOD
ÉLÉMENT DE RACCORDEMENT, STRUCTURE DE NŒUD DE MONTAGE DE TASSEAU ALC, ET PROCÉDÉ DE MONTAGE FABRIQUÉ
连接件、ALC条板安装节点结构及装配式安装方法
SUN YI (author) / ZHANG YAOLIN (author) / ZHOU YU (author) / WANG JINXIANG (author) / WANG CONG (author) / SONG YINAN (author) / PENG BAI (author) / ZHU DEQIAO (author) / LI RANRAN (author) / WANG DONGMING (author)
2021-01-21
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
CONNECTION MEMBER, ALC BATTEN MOUNTING NODE STRUCTURE, AND PREFABRICATED MOUNTING METHOD
European Patent Office | 2022
|Connection member, ALC batten mounting node structure, and prefabricated mounting method
European Patent Office | 2024
|