METHOD FOR ERECTING SEGMENTAL STEEL GIRDER ON PIER-TOP SHORT SLIDEWAY GIRDER
A method for erecting a segmental steel girder on a pier-top short slideway girder comprises: step S1, providing, on a first-segment steel girder (21), a counterweight (1) having an adjustable weight; step S2, fixing the first-segment steel girder (21) to a pre-configured first position on a pier-top short slideway girder (3); step S3, lifting a second-segment steel girder (22), and connecting the second-segment steel girder (22) to the first-segment steel girder (21) to form a first integrated steel girder; step S4, adjusting the counterweight (1) such that a target load is applied to the first integrated steel girder, and then displacing the first integrated steel girder by a pre-configured displacement; step S5, repeating the above steps S3 and S4, and sequentially connecting multiple segmental steel girders to the first integrated steel girder until all of the segmental steel girders connected thereto have an overall resistance to overturning on the pier-top short slideway girder; and step S6, erecting remaining segmental steel girders on respective two sides of all of the erected segmental steel girders. The method uses a counterweight and a sliding operation for girder erection, and the construction process is safe and reliable.
Procédé de montage d'une poutre d'acier segmentaire sur une poutre de glissière courte de sommet de pilier, comprenant les étapes suivantes : S1, la fourniture, sur une poutre d'acier de premier segment (21), d'un contrepoids (1) à poids réglable ; S2, la fixation de la poutre d'acier de premier segment (21) à une première position pré-configurée sur une poutre de glissière courte de sommet de pilier (3) ; S3, le levage d'une poutre d'acier de second segment (22), et la liaison de la poutre d'acier de second segment (22) à la poutre d'acier de premier segment (21) pour former une première poutre d'acier intégrée ; S4, le réglage du contrepoids (1) de telle sorte qu'une charge cible est appliquée à la première poutre d'acier intégrée, puis le déplacement de la première poutre d'acier intégrée au moyen d'un déplacement préconfiguré ; S5, la répétition des étapes S3 et S4 ci-dessus, et la liaison de manière séquentielle de multiples poutres d'acier segmentaires à la première poutre d'acier intégrée jusqu'à ce que toutes les poutres d'acier segmentaires reliées à celle-ci présentent une résistance globale au renversement sur la poutre de glissière courte de sommet de pilier ; et S6, le montage des poutres en acier segmentaires restantes sur les deux côtés respectifs de la totalité des poutres en acier segmentaires montées. Le procédé utilise un contrepoids et une opération de coulissement pour le montage d'une poutre, et le processus de construction est sûr et fiable.
一种墩顶短滑道梁上架设节段钢梁的方法,包括:步骤S1:在第一节段钢梁(21)上设置重量可调的配重件(1);步骤S2:将第一节段钢梁(21)落梁至墩顶短滑道梁(3)上的预设的第一位置;步骤S3:起吊第二节段钢梁(22),并将第二节段钢梁(22)与第一节段钢梁(21)对接形成第一整体钢梁;步骤S4:调整配重件(1)使得第一整体钢梁调节至目标配重后,再将第一整体钢梁移至预设的位移;步骤S5:重复上述步骤S3~S4,在第一整体钢梁上依次对接若干节段钢梁,直至对接后的所有节段钢梁在墩顶短滑道梁上具有整体抗倾覆能力;步骤S6:在已架的所有节段钢梁的两侧架设剩余的节段钢梁。该方法采用配重和滑移的方式进行架梁,施工过程安全可靠。
METHOD FOR ERECTING SEGMENTAL STEEL GIRDER ON PIER-TOP SHORT SLIDEWAY GIRDER
A method for erecting a segmental steel girder on a pier-top short slideway girder comprises: step S1, providing, on a first-segment steel girder (21), a counterweight (1) having an adjustable weight; step S2, fixing the first-segment steel girder (21) to a pre-configured first position on a pier-top short slideway girder (3); step S3, lifting a second-segment steel girder (22), and connecting the second-segment steel girder (22) to the first-segment steel girder (21) to form a first integrated steel girder; step S4, adjusting the counterweight (1) such that a target load is applied to the first integrated steel girder, and then displacing the first integrated steel girder by a pre-configured displacement; step S5, repeating the above steps S3 and S4, and sequentially connecting multiple segmental steel girders to the first integrated steel girder until all of the segmental steel girders connected thereto have an overall resistance to overturning on the pier-top short slideway girder; and step S6, erecting remaining segmental steel girders on respective two sides of all of the erected segmental steel girders. The method uses a counterweight and a sliding operation for girder erection, and the construction process is safe and reliable.
Procédé de montage d'une poutre d'acier segmentaire sur une poutre de glissière courte de sommet de pilier, comprenant les étapes suivantes : S1, la fourniture, sur une poutre d'acier de premier segment (21), d'un contrepoids (1) à poids réglable ; S2, la fixation de la poutre d'acier de premier segment (21) à une première position pré-configurée sur une poutre de glissière courte de sommet de pilier (3) ; S3, le levage d'une poutre d'acier de second segment (22), et la liaison de la poutre d'acier de second segment (22) à la poutre d'acier de premier segment (21) pour former une première poutre d'acier intégrée ; S4, le réglage du contrepoids (1) de telle sorte qu'une charge cible est appliquée à la première poutre d'acier intégrée, puis le déplacement de la première poutre d'acier intégrée au moyen d'un déplacement préconfiguré ; S5, la répétition des étapes S3 et S4 ci-dessus, et la liaison de manière séquentielle de multiples poutres d'acier segmentaires à la première poutre d'acier intégrée jusqu'à ce que toutes les poutres d'acier segmentaires reliées à celle-ci présentent une résistance globale au renversement sur la poutre de glissière courte de sommet de pilier ; et S6, le montage des poutres en acier segmentaires restantes sur les deux côtés respectifs de la totalité des poutres en acier segmentaires montées. Le procédé utilise un contrepoids et une opération de coulissement pour le montage d'une poutre, et le processus de construction est sûr et fiable.
一种墩顶短滑道梁上架设节段钢梁的方法,包括:步骤S1:在第一节段钢梁(21)上设置重量可调的配重件(1);步骤S2:将第一节段钢梁(21)落梁至墩顶短滑道梁(3)上的预设的第一位置;步骤S3:起吊第二节段钢梁(22),并将第二节段钢梁(22)与第一节段钢梁(21)对接形成第一整体钢梁;步骤S4:调整配重件(1)使得第一整体钢梁调节至目标配重后,再将第一整体钢梁移至预设的位移;步骤S5:重复上述步骤S3~S4,在第一整体钢梁上依次对接若干节段钢梁,直至对接后的所有节段钢梁在墩顶短滑道梁上具有整体抗倾覆能力;步骤S6:在已架的所有节段钢梁的两侧架设剩余的节段钢梁。该方法采用配重和滑移的方式进行架梁,施工过程安全可靠。
METHOD FOR ERECTING SEGMENTAL STEEL GIRDER ON PIER-TOP SHORT SLIDEWAY GIRDER
PROCÉDÉ DE MONTAGE D'UNE POUTRE D'ACIER SEGMENTAIRE SUR UNE POUTRE DE GLISSIÈRE COURTE DE SOMMET DE PILIER
墩顶短滑道梁上架设节段钢梁的方法
CHEN TAO (author) / LUO BING (author) / CUI YIBING (author) / ZHA DAOHONG (author) / LI JUNTANG (author) / SONG YULIANG (author) / ZHANG WENBIN (author) / YANG HAO (author) / JIANG JIANGHUA (author) / JIA WEIJUN (author)
2021-04-01
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Method for erecting segmental steel girder on pier-top short slideway girder
European Patent Office | 2022
Method for erecting segmental steel girder on pier-top short slideway girder
European Patent Office | 2024
|Method for erecting segmental steel girder on pier-top short slideway girder
European Patent Office | 2023
|Construction process for erecting segmental box girder by adopting anchoring suspension girder
European Patent Office | 2023
|