PRECAST ULTRA-HIGH-PERFORMANCE CONCRETE STEEL BRIDGE DECK PAVEMENT STRUCTURE AND PREPARATION METHOD
A precast ultra-high-performance concrete steel bridge deck pavement structure and a preparation method. The pavement structure has a total thickness of 5-8 mm, and sequentially consists of a steel slab base layer (1), a high-toughness resin waterproof bonding layer (2), a high-density fiber concrete precast pavement layer (3), and an epoxy gravel antiskid wearing layer (4) from bottom to top. The preparation method comprises the following steps: preparing a sparsely-distributed reinforcing mesh and placing same into a fixed mold to form a high-density fiber concrete precast slab; preparing high-density fiber freshly mixed concrete; pouring the high-density fiber concrete precast slab; roughcasting the bottom of the precast slab after mold removal; performing sand blasting and rust removal processing on the steel slab; coating self-adhesive cushion rubber strips on the steel slab base layer (1); separately applying an adhesive and an sealing rubber strip to a mortise of each high-density fiber concrete precast slab and then splicing the precast slabs; forming the high-density fiber concrete precast pavement layer (3); and after sandblasting roughening processing, sequentially coating a reinforced epoxy resin and a protective epoxy resin and gravel particles and performing curing. The pavement structure is fast in construction, firm in interlayer bonding and high in weather resistance.
La présente invention concerne une structure de revêtement de pont en acier en béton à ultra-haute performance préfabriquée et un procédé de préparation. La structure de revêtement présente une épaisseur totale de 5 à 8 mm et est constituée de manière séquentielle d'une couche de base de plaque d'acier (1), d'une couche de liaison étanche à l'eau de résine de haute ténacité (2), d'une couche de revêtement préfabriquée en béton à haute densité (3) et d'une couche d'usure antidérapante de gravier époxy (4) de bas en haut. Le procédé de préparation comprend les étapes suivantes consistant : à préparer un treillis de renforcement réparti de manière éparse et à placer ce dernier dans un moule fixe pour former une dalle préfabriquée en béton à haute densité; à préparer un béton fraîchement mélangé à base de fibres de haute densité; à verser la dalle préfabriquée en béton à haute densité; à rugosifier le fond de la dalle préfabriquée après un retrait de moule; à réaliser un sablage et un traitement d'élimination de rouille sur la dalle d'acier; à revêtir des bandes de caoutchouc de coussin auto-adhésives sur la couche de base de dalle d'acier (1); à appliquer séparément un adhésif et une bande de caoutchouc d'étanchéité à une mortaise de chaque dalle préfabriquée en béton à haute densité et ensuite à épisser des dalles préfabriquées; à former la couche de revêtement préfabriquée en béton à haute densité (3); et après le traitement de rugosification par sablage, à revêtir séquentiellement une résine époxy renforcée et une résine époxy protectrice et des particules de gravier et à réaliser un durcissement. La structure de revêtement présente une construction rapide, une fermeté en liaison intercouche et une résistance aux intempéries élevée.
一种预制超高性能混凝土钢桥面铺装结构及制备方法,铺装结构总厚度5-8cm,自下而上依次由钢面板基层(1)、高韧树脂防水粘接层(2)、高密纤维混凝土预制铺装层(3)和环氧碎石抗滑磨耗层(4)组成;制备方法包括以下步骤:制备疏配钢筋网置于固定模具中成型高密纤维混凝土预制板;制备高密纤维新拌混凝土;浇筑高密纤维混凝土预制板;拆模后对预制板底部拉毛;对钢面板喷砂除锈清洁处理;在钢面板基层(1)上涂布自粘型垫胶条;对高密纤维混凝土预制板的榫槽上分别涂胶黏剂和粘密封胶条再拼接;成型高密纤维混凝土预制铺装层(3);喷砂粗糙处理后,先后涂布加固型环氧树脂和防护型环氧树脂以及碎石颗粒并养护。该铺装结构施工快,层间粘接牢固,耐候性强。
PRECAST ULTRA-HIGH-PERFORMANCE CONCRETE STEEL BRIDGE DECK PAVEMENT STRUCTURE AND PREPARATION METHOD
A precast ultra-high-performance concrete steel bridge deck pavement structure and a preparation method. The pavement structure has a total thickness of 5-8 mm, and sequentially consists of a steel slab base layer (1), a high-toughness resin waterproof bonding layer (2), a high-density fiber concrete precast pavement layer (3), and an epoxy gravel antiskid wearing layer (4) from bottom to top. The preparation method comprises the following steps: preparing a sparsely-distributed reinforcing mesh and placing same into a fixed mold to form a high-density fiber concrete precast slab; preparing high-density fiber freshly mixed concrete; pouring the high-density fiber concrete precast slab; roughcasting the bottom of the precast slab after mold removal; performing sand blasting and rust removal processing on the steel slab; coating self-adhesive cushion rubber strips on the steel slab base layer (1); separately applying an adhesive and an sealing rubber strip to a mortise of each high-density fiber concrete precast slab and then splicing the precast slabs; forming the high-density fiber concrete precast pavement layer (3); and after sandblasting roughening processing, sequentially coating a reinforced epoxy resin and a protective epoxy resin and gravel particles and performing curing. The pavement structure is fast in construction, firm in interlayer bonding and high in weather resistance.
La présente invention concerne une structure de revêtement de pont en acier en béton à ultra-haute performance préfabriquée et un procédé de préparation. La structure de revêtement présente une épaisseur totale de 5 à 8 mm et est constituée de manière séquentielle d'une couche de base de plaque d'acier (1), d'une couche de liaison étanche à l'eau de résine de haute ténacité (2), d'une couche de revêtement préfabriquée en béton à haute densité (3) et d'une couche d'usure antidérapante de gravier époxy (4) de bas en haut. Le procédé de préparation comprend les étapes suivantes consistant : à préparer un treillis de renforcement réparti de manière éparse et à placer ce dernier dans un moule fixe pour former une dalle préfabriquée en béton à haute densité; à préparer un béton fraîchement mélangé à base de fibres de haute densité; à verser la dalle préfabriquée en béton à haute densité; à rugosifier le fond de la dalle préfabriquée après un retrait de moule; à réaliser un sablage et un traitement d'élimination de rouille sur la dalle d'acier; à revêtir des bandes de caoutchouc de coussin auto-adhésives sur la couche de base de dalle d'acier (1); à appliquer séparément un adhésif et une bande de caoutchouc d'étanchéité à une mortaise de chaque dalle préfabriquée en béton à haute densité et ensuite à épisser des dalles préfabriquées; à former la couche de revêtement préfabriquée en béton à haute densité (3); et après le traitement de rugosification par sablage, à revêtir séquentiellement une résine époxy renforcée et une résine époxy protectrice et des particules de gravier et à réaliser un durcissement. La structure de revêtement présente une construction rapide, une fermeté en liaison intercouche et une résistance aux intempéries élevée.
一种预制超高性能混凝土钢桥面铺装结构及制备方法,铺装结构总厚度5-8cm,自下而上依次由钢面板基层(1)、高韧树脂防水粘接层(2)、高密纤维混凝土预制铺装层(3)和环氧碎石抗滑磨耗层(4)组成;制备方法包括以下步骤:制备疏配钢筋网置于固定模具中成型高密纤维混凝土预制板;制备高密纤维新拌混凝土;浇筑高密纤维混凝土预制板;拆模后对预制板底部拉毛;对钢面板喷砂除锈清洁处理;在钢面板基层(1)上涂布自粘型垫胶条;对高密纤维混凝土预制板的榫槽上分别涂胶黏剂和粘密封胶条再拼接;成型高密纤维混凝土预制铺装层(3);喷砂粗糙处理后,先后涂布加固型环氧树脂和防护型环氧树脂以及碎石颗粒并养护。该铺装结构施工快,层间粘接牢固,耐候性强。
PRECAST ULTRA-HIGH-PERFORMANCE CONCRETE STEEL BRIDGE DECK PAVEMENT STRUCTURE AND PREPARATION METHOD
STRUCTURE DE REVÊTEMENT DE PONT EN ACIER EN BÉTON À ULTRA-HAUTE PERFORMANCE PRÉFABRIQUÉE ET PROCÉDÉ DE PRÉPARATION
一种预制超高性能混凝土钢桥面铺装结构及制备方法
ZHANG ZHIXIANG (author) / ZHANG HUI (author) / PAN YOUQIANG (author) / CHEN LIFENG (author) / LUO RUILIN (author) / CUI LEI (author) / GUAN YONGSHENG (author)
2021-04-29
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|European Patent Office | 2022
|Concrete pavement structure for steel bridge deck and pavement method of concrete pavement structure
European Patent Office | 2023
|