SWIRL POOL CONSTRUCTION METHOD EMPLOYING SEMI-REVERSE CONSTRUCTION
A swirl pool construction method employing semi-reverse construction, characterized by comprising the following steps: a, building a swirl pool wall cylinder by means of a forward construction method, and building segments of the swirl pool wall cylinder from ±0 m to -11.0 m; and b, building the swirl pool wall cylinder by means of a reverse construction method, performing drilling from -11 m to -14 m, using concrete to perform construction after completion of the drilling, building a well wall segment from -14 m to -17 m after the strength of the concrete reaches 75%, and building a cylinder wall from -17 m to -21.6 m and on a bottom plate after completion of the well wall construction. The present invention is a novel breakthrough compared with a conventional total reverse construction method, achieves good effects in terms of soil retaining, supporting, waterproofing, and seepage prevention, and ensures that the pool wall has high strength, high rigidity, and good impermeability. The construction is fast, and an outer cylindrical pool wall is segmented from the middle to the bottom to achieve a balance of various resources, thereby facilitating organization and coordination, improving construction efficiency, and ensuring construction progress. Workload on each construction segment is substantially equal, and materials, machines and tools, labor, and deadlines are well coordinated.
L'invention concerne un procédé de construction de bassin à tourbillons utilisant une construction semi-inverse, caractérisé en ce qu'il comprend les étapes suivantes : a, construire un cylindre de paroi de bassin à tourbillons au moyen d'un procédé de construction vers l'avant, et construire des segments du cylindre de paroi de bassin à tourbillons de ± 0 m à -11,0 m ; et b, construire le cylindre de paroi de bassin à tourbillons au moyen d'un procédé de construction inverse, effectuer un forage de -11 m à -14 m, en utilisant du béton pour réaliser la construction après l'achèvement du forage, construire un segment de paroi de puits de -14 m à -17 m après que la résistance du béton a atteint 75 %, et construire une paroi de cylindre de -17 m à -21,6 m et sur une plaque de fond après l'achèvement de la construction de la paroi de puits. La présente invention est une percée innovante par rapport à un procédé de construction complètement inverse classique, obtient de bons effets en termes de rétention de sol, de support, d'imperméabilisation et de prévention d'infiltration, et assure que la paroi de bassin présente une résistance élevée, une rigidité élevée et une bonne imperméabilité. La construction est rapide, et une paroi de bassin cylindrique externe est segmentée du milieu au fond pour obtenir un équilibre de diverses ressources, ce qui facilite l'organisation et la coordination, améliore l'efficacité de construction, et assure la progression de la construction. La charge de travail sur chaque segment de construction est sensiblement égale, et les matériaux, les machines et les outils, le travail et les délais sont bien coordonnés.
一种旋流池半逆作法施工方法,其特征在于包括以下步骤:a、旋流池壁筒体进行顺作法施工,旋流池壁筒体作自±0米至-11.0米段施工,b、旋流池壁筒体进行逆作法施工,先进行-11~-14m的破凿,破凿完成后进行混凝土的施工,待强度达到75%后再转入-14至-17m处井壁施工段,施工完成后进行-17~-21.6m筒壁及底板的施工。本发明具有突破传统全逆法施工方法的新颖性,挡土、支护、防水截渗效果好,池壁自身强度高、刚度大和抗渗性能好,施工速度快,外筒池壁分节从中往下进行达到各种资源趋于均衡,便于组织协调,施工工效提高,促进施工进度,每节施工工作量大致均衡和材料、机具、人员、工期较好协调的优点。
SWIRL POOL CONSTRUCTION METHOD EMPLOYING SEMI-REVERSE CONSTRUCTION
A swirl pool construction method employing semi-reverse construction, characterized by comprising the following steps: a, building a swirl pool wall cylinder by means of a forward construction method, and building segments of the swirl pool wall cylinder from ±0 m to -11.0 m; and b, building the swirl pool wall cylinder by means of a reverse construction method, performing drilling from -11 m to -14 m, using concrete to perform construction after completion of the drilling, building a well wall segment from -14 m to -17 m after the strength of the concrete reaches 75%, and building a cylinder wall from -17 m to -21.6 m and on a bottom plate after completion of the well wall construction. The present invention is a novel breakthrough compared with a conventional total reverse construction method, achieves good effects in terms of soil retaining, supporting, waterproofing, and seepage prevention, and ensures that the pool wall has high strength, high rigidity, and good impermeability. The construction is fast, and an outer cylindrical pool wall is segmented from the middle to the bottom to achieve a balance of various resources, thereby facilitating organization and coordination, improving construction efficiency, and ensuring construction progress. Workload on each construction segment is substantially equal, and materials, machines and tools, labor, and deadlines are well coordinated.
L'invention concerne un procédé de construction de bassin à tourbillons utilisant une construction semi-inverse, caractérisé en ce qu'il comprend les étapes suivantes : a, construire un cylindre de paroi de bassin à tourbillons au moyen d'un procédé de construction vers l'avant, et construire des segments du cylindre de paroi de bassin à tourbillons de ± 0 m à -11,0 m ; et b, construire le cylindre de paroi de bassin à tourbillons au moyen d'un procédé de construction inverse, effectuer un forage de -11 m à -14 m, en utilisant du béton pour réaliser la construction après l'achèvement du forage, construire un segment de paroi de puits de -14 m à -17 m après que la résistance du béton a atteint 75 %, et construire une paroi de cylindre de -17 m à -21,6 m et sur une plaque de fond après l'achèvement de la construction de la paroi de puits. La présente invention est une percée innovante par rapport à un procédé de construction complètement inverse classique, obtient de bons effets en termes de rétention de sol, de support, d'imperméabilisation et de prévention d'infiltration, et assure que la paroi de bassin présente une résistance élevée, une rigidité élevée et une bonne imperméabilité. La construction est rapide, et une paroi de bassin cylindrique externe est segmentée du milieu au fond pour obtenir un équilibre de diverses ressources, ce qui facilite l'organisation et la coordination, améliore l'efficacité de construction, et assure la progression de la construction. La charge de travail sur chaque segment de construction est sensiblement égale, et les matériaux, les machines et les outils, le travail et les délais sont bien coordonnés.
一种旋流池半逆作法施工方法,其特征在于包括以下步骤:a、旋流池壁筒体进行顺作法施工,旋流池壁筒体作自±0米至-11.0米段施工,b、旋流池壁筒体进行逆作法施工,先进行-11~-14m的破凿,破凿完成后进行混凝土的施工,待强度达到75%后再转入-14至-17m处井壁施工段,施工完成后进行-17~-21.6m筒壁及底板的施工。本发明具有突破传统全逆法施工方法的新颖性,挡土、支护、防水截渗效果好,池壁自身强度高、刚度大和抗渗性能好,施工速度快,外筒池壁分节从中往下进行达到各种资源趋于均衡,便于组织协调,施工工效提高,促进施工进度,每节施工工作量大致均衡和材料、机具、人员、工期较好协调的优点。
SWIRL POOL CONSTRUCTION METHOD EMPLOYING SEMI-REVERSE CONSTRUCTION
PROCÉDÉ DE CONSTRUCTION DE BASSIN À TOURBILLONS UTILISANT UNE CONSTRUCTION SEMI-INVERSE
一种旋流池半逆作法施工方法
MOU XIAOLIANG (author) / SONG MAOXIANG (author) / ZHANG ZHENG (author) / PENG ENXIONG (author)
2021-05-27
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES