A platform for research: civil engineering, architecture and urbanism
COMPOSITE EXPANDED-PLATE PILE CONSTRUCTION METHOD AND EQUIPMENT
A composite expanded-plate pile construction method, comprising: performing jet mixing at a preset position to form a composite solidified body (403, 404, 503, 504), the preset position comprising a preset plate position of a pile structure and/or a pile end position of the pile structure; constructing a pile hole by a drilling machine according to the pre-designed pile structure, and if the pre-designed pile structure comprises a plate (402, 502), forming a plate cavity at a pre-designed plate position; and cleaning the pile hole, hoisting and placing a steel reinforcement cage, placing a concrete pouring pipe to the pile hole, and raising the pouring pipe while pouring concrete, the concrete becoming a pile body (401, 501) in the pile hole and the plate (402, 502) in the plate cavity after curing. In this way, the composite expanded-plate pile construction method can completely avoid the problem of hole wall collapse at the plate cavity in the drilling process, and the combined structure of the plate (402, 502) and the composite solidified body can greatly improve the bearing capacity of the pile foundation, significantly reduce settlement of the pile foundation, reduce cost of the pile foundation, and shorten the construction duration.
L'invention concerne un procédé de construction de pieu à plaque expansée composite, comprenant les étapes consistant à : réaliser un mélange par jet à une position prédéfinie pour former un corps (403, 404, 503, 504) solidifié composite, la position prédéfinie comprenant une position de plaque prédéfinie d'une structure de pieu et/ou une position d'extrémité de pieu de la structure de pieu ; creuser un trou de pieu à l'aide d'une machine de forage selon la structure de pieu pré-conçue, et si la structure de pieu pré-conçue comprend une plaque (402, 502), former une cavité de plaque à une position de plaque prédéfinie ; et nettoyer le trou de pieu, lever et placer une cage de renforcement en acier, placer une conduite d'injection de béton au trou de pieu, et soulever la conduite d'injection de béton pendant le coulage du béton, le béton devenant un corps (401, 501) de pieu dans le trou de pieu et la plaque (402, 502) dans la cavité de plaque après durcissement. De cette manière, le procédé de construction de pieu à plaque expansée composite peut éviter complètement le problème de l'effondrement de paroi de trou au niveau de la cavité de plaque dans le processus de forage, et la structure combinée de la plaque (402, 502) et le corps solidifié composite peut améliorer de manière considérable la capacité de support de la fondation sur pieux, réduire de manière significative le tassement de la fondation sur pieux, réduire le coût de la fondation sur pieux et raccourcir la durée de construction.
一种复合扩盘桩施工方法,包括在预设位置处实施喷射搅拌形成复合固结体(403,404,503,504),所述预设位置包括桩体结构的预设盘位处,和/或桩体结构的桩端位置;按照预先设计的桩体结构用钻机进行桩孔的施工,当所述预先设计的桩体结构包括盘体(402,502)时,在预先设计的盘体位置进行盘腔成形;对所述桩孔进行清孔,吊放钢筋笼并下放混凝土灌注导管至所述桩孔,在灌注混凝土的同时上提所述灌注导管,所述混凝土硬化后,在所述桩孔内成为桩身(401,501),在所述盘腔处成为盘体(402,502)。这样,该复合扩盘桩施工方法能够完全杜绝钻孔过程中的盘腔处孔壁塌孔的问题,且盘体(402,502)与复合固结体的组合结构能够大幅度提高桩基的承载力,显著减小桩基沉降,降低桩基造价,缩短施工工期。
COMPOSITE EXPANDED-PLATE PILE CONSTRUCTION METHOD AND EQUIPMENT
A composite expanded-plate pile construction method, comprising: performing jet mixing at a preset position to form a composite solidified body (403, 404, 503, 504), the preset position comprising a preset plate position of a pile structure and/or a pile end position of the pile structure; constructing a pile hole by a drilling machine according to the pre-designed pile structure, and if the pre-designed pile structure comprises a plate (402, 502), forming a plate cavity at a pre-designed plate position; and cleaning the pile hole, hoisting and placing a steel reinforcement cage, placing a concrete pouring pipe to the pile hole, and raising the pouring pipe while pouring concrete, the concrete becoming a pile body (401, 501) in the pile hole and the plate (402, 502) in the plate cavity after curing. In this way, the composite expanded-plate pile construction method can completely avoid the problem of hole wall collapse at the plate cavity in the drilling process, and the combined structure of the plate (402, 502) and the composite solidified body can greatly improve the bearing capacity of the pile foundation, significantly reduce settlement of the pile foundation, reduce cost of the pile foundation, and shorten the construction duration.
L'invention concerne un procédé de construction de pieu à plaque expansée composite, comprenant les étapes consistant à : réaliser un mélange par jet à une position prédéfinie pour former un corps (403, 404, 503, 504) solidifié composite, la position prédéfinie comprenant une position de plaque prédéfinie d'une structure de pieu et/ou une position d'extrémité de pieu de la structure de pieu ; creuser un trou de pieu à l'aide d'une machine de forage selon la structure de pieu pré-conçue, et si la structure de pieu pré-conçue comprend une plaque (402, 502), former une cavité de plaque à une position de plaque prédéfinie ; et nettoyer le trou de pieu, lever et placer une cage de renforcement en acier, placer une conduite d'injection de béton au trou de pieu, et soulever la conduite d'injection de béton pendant le coulage du béton, le béton devenant un corps (401, 501) de pieu dans le trou de pieu et la plaque (402, 502) dans la cavité de plaque après durcissement. De cette manière, le procédé de construction de pieu à plaque expansée composite peut éviter complètement le problème de l'effondrement de paroi de trou au niveau de la cavité de plaque dans le processus de forage, et la structure combinée de la plaque (402, 502) et le corps solidifié composite peut améliorer de manière considérable la capacité de support de la fondation sur pieux, réduire de manière significative le tassement de la fondation sur pieux, réduire le coût de la fondation sur pieux et raccourcir la durée de construction.
一种复合扩盘桩施工方法,包括在预设位置处实施喷射搅拌形成复合固结体(403,404,503,504),所述预设位置包括桩体结构的预设盘位处,和/或桩体结构的桩端位置;按照预先设计的桩体结构用钻机进行桩孔的施工,当所述预先设计的桩体结构包括盘体(402,502)时,在预先设计的盘体位置进行盘腔成形;对所述桩孔进行清孔,吊放钢筋笼并下放混凝土灌注导管至所述桩孔,在灌注混凝土的同时上提所述灌注导管,所述混凝土硬化后,在所述桩孔内成为桩身(401,501),在所述盘腔处成为盘体(402,502)。这样,该复合扩盘桩施工方法能够完全杜绝钻孔过程中的盘腔处孔壁塌孔的问题,且盘体(402,502)与复合固结体的组合结构能够大幅度提高桩基的承载力,显著减小桩基沉降,降低桩基造价,缩短施工工期。
COMPOSITE EXPANDED-PLATE PILE CONSTRUCTION METHOD AND EQUIPMENT
PROCÉDÉ ET ÉQUIPEMENT DE CONSTRUCTION DE PIEU À PLAQUE EXPANSÉE COMPOSITE
一种复合扩盘桩施工方法及设备
ZHU BO (author) / PEI XIAOFENG (author) / CHEN YONGSHUN (author) / PEI JUANYI (author) / ZHU LUNING (author)
2021-06-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
COMPOSITE EXPANDED-PLATE PILE CONSTRUCTION METHOD AND EQUIPMENT
European Patent Office | 2022
|Expanded-base composite pile and construction method thereof
European Patent Office | 2020
|European Patent Office | 2015
|Construction method of free-angle high-bearing composite expanded pile
European Patent Office | 2023
|