PILE PRESSING METHOD AND PILE PRESSING APPARATUS CONTROL METHOD
Disclosed in the present invention is a pile pressing method comprising: a primary pressing step of transporting a first pile (11) of a plurality of piles (10) so as to support same in an erect state on the pressing point of the ground, and pressurizing the first pile (11) so as to press same into the ground; a secondary pressing step of transporting a second pile (12) of the plurality of piles (10) so as to support same in an erect state on the pressing point of the ground, coupling the lower end of the second pile (12) to the upper end of the first pile (11), and pressurizing the second pile (12) so as to press same into the ground; a continuous pressing step of pressing, by means of a method which is the same as that of the secondary pressing step, the plurality of piles (10) into the ground while sequentially coupling same; a target load (W1) and target speed setting step of respectively setting, as a target load (W1) and a target speed (v1), a pressing load (W) and a pressing speed (v) when a state in which the support strength of a pile base structure is ensured is reached; and a pressing operation completion step of completing the continuous pressing step when the measured pressing load (W) of the pile (10) reaches the preset target load (W1) and the measured pressing speed (v) of the pile (10) reaches the preset target speed (v1) during the continuous pressing step, and thus the present invention can easily ensure the structural stability of all of the plurality of constructed pile base structures.
La présente invention concerne un procédé de battage de pieux comprenant : une étape de battage primaire consistant à transporter un premier pieu (11) d'une pluralité de pieux (10) de manière à supporter celui-ci dans un état dressé sur le point d'enfoncement au sol, et à presser le premier pieu (11) de manière à enfoncer celui-ci dans le sol ; une étape de battage secondaire consistant à transporter un second pieu (12) de la pluralité de pieux (10) de façon à supporter celui-ci dans un état dressé sur le point d'enfoncement au sol, à coupler l'extrémité inférieure du second pieu (12) avec l'extrémité supérieure du premier pieu (11), et mettre sous pression le second pieu (12) de manière à enfoncer celui-ci dans le sol ; une étape de pressage continu consistant à enfoncer, au moyen d'un procédé qui est le même que celui de l'étape de battage secondaire, la pluralité de pieux (10) dans le sol tout en les couplant séquentiellement ; une charge cible (W1) et une étape de réglage de vitesse cible consistant à régler respectivement, en tant que charge cible (W1) et une vitesse cible (v1), une charge de pressage (W) et une vitesse de pressage (v) lorsqu'un état dans lequel la résistance de support d'une structure de base de pieu est garantie est atteinte ; et une étape d'achèvement d'opération de battage consistant à achever l'étape de battage continu lorsque la charge de pression mesurée (W) du pieu (10) atteint la charge cible prédéfinie (W1) et la vitesse de pressage mesurée (v) du pieu (10) atteint la vitesse cible prédéfinie (v1) pendant l'étape de pressage continu ; la présente invention peut ainsi facilement assurer la stabilité structurelle de la totalité de la pluralité de structures de base de pieux construites.
본 발명은 다수의 말뚝(10) 중 1번 말뚝(11)을 운반하여, 지반의 압입지점의 상부에 기립상태로 지지하고, 상기 1번 말뚝(11)을 가압하여 지반에 압입하는 1차 압입단계; 다수의 상기 말뚝(10) 중 2번 말뚝(12)을 운반하여, 지반의 압입지점의 상부에 기립상태로 지지하되, 상기 1번 말뚝(11)의 상단에 상기 2번 말뚝(12)의 하단을 결합하고, 상기 2번 말뚝(12)을 가압하여 지반에 압입하는 2차 압입단계; 상기 2차 압입단계와 동일한 방법으로, 다수의 상기 말뚝(10)을 순차적으로 결합하면서 지반에 압입하는 연속 압입단계; 말뚝 기초구조물의 지지력이 확보된 상태에 도달한 경우의 압입하중(W) 및 압입속도(v)를 각각 목표하중(W1) 및 목표속도(v1)로 설정하는 목표하중(W1) 및 목표속도 설정단계; 상기 연속 압입단계 도중, 측정된 상기 말뚝(10)의 압입하중(W)이 미리 설정된 목표하중(W1)에 도달함과 아울러, 측정된 상기 말뚝(10)의 압입속도(v)가 미리 설정된 목표속도(v1)에 도달하면, 상기 연속 압입단계를 종료하는 압입작업 종료단계;를 포함하는 것을 특징으로 하는 말뚝압입방법을 제시함으로써, 시공된 다수의 말뚝 기초구조물 모두의 구조적 안정성을 쉽게 확보할 수 있도록 한다.
PILE PRESSING METHOD AND PILE PRESSING APPARATUS CONTROL METHOD
Disclosed in the present invention is a pile pressing method comprising: a primary pressing step of transporting a first pile (11) of a plurality of piles (10) so as to support same in an erect state on the pressing point of the ground, and pressurizing the first pile (11) so as to press same into the ground; a secondary pressing step of transporting a second pile (12) of the plurality of piles (10) so as to support same in an erect state on the pressing point of the ground, coupling the lower end of the second pile (12) to the upper end of the first pile (11), and pressurizing the second pile (12) so as to press same into the ground; a continuous pressing step of pressing, by means of a method which is the same as that of the secondary pressing step, the plurality of piles (10) into the ground while sequentially coupling same; a target load (W1) and target speed setting step of respectively setting, as a target load (W1) and a target speed (v1), a pressing load (W) and a pressing speed (v) when a state in which the support strength of a pile base structure is ensured is reached; and a pressing operation completion step of completing the continuous pressing step when the measured pressing load (W) of the pile (10) reaches the preset target load (W1) and the measured pressing speed (v) of the pile (10) reaches the preset target speed (v1) during the continuous pressing step, and thus the present invention can easily ensure the structural stability of all of the plurality of constructed pile base structures.
La présente invention concerne un procédé de battage de pieux comprenant : une étape de battage primaire consistant à transporter un premier pieu (11) d'une pluralité de pieux (10) de manière à supporter celui-ci dans un état dressé sur le point d'enfoncement au sol, et à presser le premier pieu (11) de manière à enfoncer celui-ci dans le sol ; une étape de battage secondaire consistant à transporter un second pieu (12) de la pluralité de pieux (10) de façon à supporter celui-ci dans un état dressé sur le point d'enfoncement au sol, à coupler l'extrémité inférieure du second pieu (12) avec l'extrémité supérieure du premier pieu (11), et mettre sous pression le second pieu (12) de manière à enfoncer celui-ci dans le sol ; une étape de pressage continu consistant à enfoncer, au moyen d'un procédé qui est le même que celui de l'étape de battage secondaire, la pluralité de pieux (10) dans le sol tout en les couplant séquentiellement ; une charge cible (W1) et une étape de réglage de vitesse cible consistant à régler respectivement, en tant que charge cible (W1) et une vitesse cible (v1), une charge de pressage (W) et une vitesse de pressage (v) lorsqu'un état dans lequel la résistance de support d'une structure de base de pieu est garantie est atteinte ; et une étape d'achèvement d'opération de battage consistant à achever l'étape de battage continu lorsque la charge de pression mesurée (W) du pieu (10) atteint la charge cible prédéfinie (W1) et la vitesse de pressage mesurée (v) du pieu (10) atteint la vitesse cible prédéfinie (v1) pendant l'étape de pressage continu ; la présente invention peut ainsi facilement assurer la stabilité structurelle de la totalité de la pluralité de structures de base de pieux construites.
본 발명은 다수의 말뚝(10) 중 1번 말뚝(11)을 운반하여, 지반의 압입지점의 상부에 기립상태로 지지하고, 상기 1번 말뚝(11)을 가압하여 지반에 압입하는 1차 압입단계; 다수의 상기 말뚝(10) 중 2번 말뚝(12)을 운반하여, 지반의 압입지점의 상부에 기립상태로 지지하되, 상기 1번 말뚝(11)의 상단에 상기 2번 말뚝(12)의 하단을 결합하고, 상기 2번 말뚝(12)을 가압하여 지반에 압입하는 2차 압입단계; 상기 2차 압입단계와 동일한 방법으로, 다수의 상기 말뚝(10)을 순차적으로 결합하면서 지반에 압입하는 연속 압입단계; 말뚝 기초구조물의 지지력이 확보된 상태에 도달한 경우의 압입하중(W) 및 압입속도(v)를 각각 목표하중(W1) 및 목표속도(v1)로 설정하는 목표하중(W1) 및 목표속도 설정단계; 상기 연속 압입단계 도중, 측정된 상기 말뚝(10)의 압입하중(W)이 미리 설정된 목표하중(W1)에 도달함과 아울러, 측정된 상기 말뚝(10)의 압입속도(v)가 미리 설정된 목표속도(v1)에 도달하면, 상기 연속 압입단계를 종료하는 압입작업 종료단계;를 포함하는 것을 특징으로 하는 말뚝압입방법을 제시함으로써, 시공된 다수의 말뚝 기초구조물 모두의 구조적 안정성을 쉽게 확보할 수 있도록 한다.
PILE PRESSING METHOD AND PILE PRESSING APPARATUS CONTROL METHOD
PROCÉDÉ DE BATTAGE DE PIEUX ET PROCÉDÉ DE COMMANDE D'APPAREIL DE BATTAGE DE PIEUX
말뚝압입방법 및 말뚝압입장치의 제어방법
PARK HONG (author) / SONG HYUN YONG (author) / JEON IL SOO (author)
2021-06-24
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
PILE PRESSING METHOD AND CONTROLLING METHOD FOR PILE PRESSING APPARATUS