A platform for research: civil engineering, architecture and urbanism
BUILDING ASSISTANCE METHOD AND BUILDING ASSISTANCE SYSTEM
Provided is a building assistance method that enables a worker to adjust a building structural material as quickly and appropriately as possible while minimizing labor costs. On the basis of a design value for a built-in building structural material and a measured value obtained via a surveying instrument, a correction amount and a correction direction for the component core of the building structural material are calculated to display a correction guide image. A worker operates an adjustment jig on the basis of the correction guide image. After the correction amount and the correction direction have been calculated by using a prism mode to collimate markers initially installed on the building structural material, the collimation direction of the surveying instrument is set to a design position for the component core, and a process of calculating the correction amount and the correction direction on the basis of non-prism survey data surveyed in a non-prism mode and imaging data captured at the time is repeated.
L'invention concerne un procédé d'assistance à la construction, qui permet à un travailleur d'ajuster un matériau structural de construction aussi rapidement et correctement que possible tout en rendant minimaux les coûts de main-d'œuvre. Sur la base d'une valeur de conception pour un matériau structural de construction intégré et d'une valeur mesurée obtenue par l'intermédiaire d'un instrument d'étude, une quantité de correction et une direction de correction pour le cœur de composant du matériau structural de construction sont calculées pour afficher une image de guidage de correction. Un travailleur actionne un gabarit d'ajustement sur la base de l'image de guidage de correction. Après que la quantité de correction et la direction de correction ont été calculées à l'aide d'un mode prismatique pour collimater des marqueurs initialement installés sur le matériau structural de construction, la direction de collimation de l'instrument d'étude est établie à une position de conception pour le cœur de composant, et un processus de calcul de la quantité de correction et de la direction de correction, sur la base de données d'étude non prismatique, étudiées dans un mode non prismatique, et de données d'imagerie capturées à ce moment, est répété.
人件費を抑制しつつ作業者による建築構造材の調整作業を可及的に速やかに且つ適切に行なうことができる建方支援方法を提供する。 【解決手段】建て込まれた建築構造材に対する設計値と測量機器を介して得られた実測値とに基づいて、当該建築構造材の部材芯に対する補正量及び補正方向を算出して補正案内画像を表示し、当該補正案内画像に基づいて作業者が調整治具を操作するように構成され、初期に建築構造材に設置されたマーカーをプリズムモードで視準して補正量及び補正方向を算出した後は、測量機器の視準方向を部材芯の設計位置に設定し、ノンプリズムモードで測量したノンプリズム測量データと、そのときの撮像データに基づいて補正量及び補正方向を算出する処理を繰り返す。
BUILDING ASSISTANCE METHOD AND BUILDING ASSISTANCE SYSTEM
Provided is a building assistance method that enables a worker to adjust a building structural material as quickly and appropriately as possible while minimizing labor costs. On the basis of a design value for a built-in building structural material and a measured value obtained via a surveying instrument, a correction amount and a correction direction for the component core of the building structural material are calculated to display a correction guide image. A worker operates an adjustment jig on the basis of the correction guide image. After the correction amount and the correction direction have been calculated by using a prism mode to collimate markers initially installed on the building structural material, the collimation direction of the surveying instrument is set to a design position for the component core, and a process of calculating the correction amount and the correction direction on the basis of non-prism survey data surveyed in a non-prism mode and imaging data captured at the time is repeated.
L'invention concerne un procédé d'assistance à la construction, qui permet à un travailleur d'ajuster un matériau structural de construction aussi rapidement et correctement que possible tout en rendant minimaux les coûts de main-d'œuvre. Sur la base d'une valeur de conception pour un matériau structural de construction intégré et d'une valeur mesurée obtenue par l'intermédiaire d'un instrument d'étude, une quantité de correction et une direction de correction pour le cœur de composant du matériau structural de construction sont calculées pour afficher une image de guidage de correction. Un travailleur actionne un gabarit d'ajustement sur la base de l'image de guidage de correction. Après que la quantité de correction et la direction de correction ont été calculées à l'aide d'un mode prismatique pour collimater des marqueurs initialement installés sur le matériau structural de construction, la direction de collimation de l'instrument d'étude est établie à une position de conception pour le cœur de composant, et un processus de calcul de la quantité de correction et de la direction de correction, sur la base de données d'étude non prismatique, étudiées dans un mode non prismatique, et de données d'imagerie capturées à ce moment, est répété.
人件費を抑制しつつ作業者による建築構造材の調整作業を可及的に速やかに且つ適切に行なうことができる建方支援方法を提供する。 【解決手段】建て込まれた建築構造材に対する設計値と測量機器を介して得られた実測値とに基づいて、当該建築構造材の部材芯に対する補正量及び補正方向を算出して補正案内画像を表示し、当該補正案内画像に基づいて作業者が調整治具を操作するように構成され、初期に建築構造材に設置されたマーカーをプリズムモードで視準して補正量及び補正方向を算出した後は、測量機器の視準方向を部材芯の設計位置に設定し、ノンプリズムモードで測量したノンプリズム測量データと、そのときの撮像データに基づいて補正量及び補正方向を算出する処理を繰り返す。
BUILDING ASSISTANCE METHOD AND BUILDING ASSISTANCE SYSTEM
PROCÉDÉ D'ASSISTANCE À LA CONSTRUCTION ET SYSTÈME D'ASSISTANCE À LA CONSTRUCTION
建方支援方法及び建方支援システム
OKUNO MASASHI (author) / YAMADA YASUSHI (author) / TANAKA TATSU (author) / MORITA EIJI (author) / NAITO MITSUHIRO (author) / TANIYAMA HIDEOMI (author)
2021-10-14
Patent
Electronic Resource
Japanese
Computer Assistance for Sustainable Building Design
Springer Verlag | 2006
|Research Assistance for IWASRI Capacity Building
British Library Conference Proceedings | 2003
|Computer Assistance for Sustainable Building Design
British Library Conference Proceedings | 2006
|Assistance to building construction coordination by images
British Library Conference Proceedings | 2004
|