METHOD FOR CONSTRUCTING DESERT HILL BY USING WASTE TIRES
Disclosed is a method for constructing a desert hill by using waste tires, the method comprising the following steps: step 1, transporting waste tires to a desert, and then piling up the waste tires into a conical hill pile; step 2, after the conical waste tire hill pile is piled up, sequentially arranging platforms for a belt conveyor to be placed thereon on the waste tire hill pile at certain vertical distances from the bottom to the top; step 3, spreading sand on the waste tire hill pile by using the belt conveyor until all the tires are covered; and step 4, planting grass and trees on the waste tire hill pile covered with the sand. According to the method for constructing a desert hill by using waste tires, a large number of tires which cannot be recycled are reused, and the waste tire hill pile is piled in the desert to form a firm framework, such that the movement and expansion of sand dunes are stopped, desertification can be controlled, and land occupation and hazards are reduced.
Est divulgué, un procédé de construction d'une colline de désert à l'aide de pneus usagés, le procédé comprenant les étapes suivantes : étape (1), le transport de pneus usagés dans un désert, puis l'empilement des pneus usagés en une colline de désert conique; étape (2), après l'empilement du tas de pneus usagés en colline conique, l'agencement séquentiel de plates-formes pour y placer un transporteur à courroie sur le tas de pneus usagés en colline à certaines distances verticales du bas vers le haut; étape (3), l'étalement de sable sur le tas de pneus usagés en colline à l'aide du transporteur à courroie jusqu'à ce que tous les pneus soient recouverts; et étape (4), la plantation d'herbe et d'arbres sur le tas de pneus usagés en colline recouvert de sable. Selon le procédé de construction d'une colline de désert à l'aide de pneus usagés, un grand nombre de pneus qui ne peuvent pas être recyclés sont réutilisés, et le tas de pneus usagés en colline est empilé dans le désert pour former une structure ferme, de telle sorte que le mouvement et l'expansion des dunes de sable sont stoppés, la désertification peut être contrôlée, et l'occupation des terres et les risques sont réduits.
一种利用废旧轮胎修建设沙漠山丘的方法,包括以下步骤:步骤1、将废旧轮胎运往沙漠,然后将废旧轮胎堆积成圆锥形的山堆;步骤2、堆好圆锥形的废旧轮胎山堆后,在废旧轮胎山堆上从底部往顶部依次每隔一定垂直距离设置平台停放皮带运输机;步骤3、用皮带运输机将沙子扬洒在废旧轮胎山堆上,直到将全部轮胎覆盖;步骤4、将覆盖沙子的废旧轮胎山堆上种植草木。利用废旧轮胎修建设沙漠山丘的方法使得大量无法回收的轮胎得到了再利用,且在沙漠中堆积废旧轮胎山堆形成了牢固的骨架,阻断了沙丘的移动和扩大,可以控制荒漠化,减少了占地和危害。
METHOD FOR CONSTRUCTING DESERT HILL BY USING WASTE TIRES
Disclosed is a method for constructing a desert hill by using waste tires, the method comprising the following steps: step 1, transporting waste tires to a desert, and then piling up the waste tires into a conical hill pile; step 2, after the conical waste tire hill pile is piled up, sequentially arranging platforms for a belt conveyor to be placed thereon on the waste tire hill pile at certain vertical distances from the bottom to the top; step 3, spreading sand on the waste tire hill pile by using the belt conveyor until all the tires are covered; and step 4, planting grass and trees on the waste tire hill pile covered with the sand. According to the method for constructing a desert hill by using waste tires, a large number of tires which cannot be recycled are reused, and the waste tire hill pile is piled in the desert to form a firm framework, such that the movement and expansion of sand dunes are stopped, desertification can be controlled, and land occupation and hazards are reduced.
Est divulgué, un procédé de construction d'une colline de désert à l'aide de pneus usagés, le procédé comprenant les étapes suivantes : étape (1), le transport de pneus usagés dans un désert, puis l'empilement des pneus usagés en une colline de désert conique; étape (2), après l'empilement du tas de pneus usagés en colline conique, l'agencement séquentiel de plates-formes pour y placer un transporteur à courroie sur le tas de pneus usagés en colline à certaines distances verticales du bas vers le haut; étape (3), l'étalement de sable sur le tas de pneus usagés en colline à l'aide du transporteur à courroie jusqu'à ce que tous les pneus soient recouverts; et étape (4), la plantation d'herbe et d'arbres sur le tas de pneus usagés en colline recouvert de sable. Selon le procédé de construction d'une colline de désert à l'aide de pneus usagés, un grand nombre de pneus qui ne peuvent pas être recyclés sont réutilisés, et le tas de pneus usagés en colline est empilé dans le désert pour former une structure ferme, de telle sorte que le mouvement et l'expansion des dunes de sable sont stoppés, la désertification peut être contrôlée, et l'occupation des terres et les risques sont réduits.
一种利用废旧轮胎修建设沙漠山丘的方法,包括以下步骤:步骤1、将废旧轮胎运往沙漠,然后将废旧轮胎堆积成圆锥形的山堆;步骤2、堆好圆锥形的废旧轮胎山堆后,在废旧轮胎山堆上从底部往顶部依次每隔一定垂直距离设置平台停放皮带运输机;步骤3、用皮带运输机将沙子扬洒在废旧轮胎山堆上,直到将全部轮胎覆盖;步骤4、将覆盖沙子的废旧轮胎山堆上种植草木。利用废旧轮胎修建设沙漠山丘的方法使得大量无法回收的轮胎得到了再利用,且在沙漠中堆积废旧轮胎山堆形成了牢固的骨架,阻断了沙丘的移动和扩大,可以控制荒漠化,减少了占地和危害。
METHOD FOR CONSTRUCTING DESERT HILL BY USING WASTE TIRES
PROCÉDÉ DE CONSTRUCTION DE COLLINE DE DÉSERT À L'AIDE DE PNEUS USAGÉS
一种利用废旧轮胎修建设沙漠山丘的方法
ZHOU LIANHUI (author)
2022-01-27
Patent
Electronic Resource
Chinese
IPC:
A01G
Gartenbau
,
HORTICULTURE
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
System and method for constructing a culvert using vehicle tires
European Patent Office | 2021
|System and Method for Constructing a Culvert Using Vehicle Tires
European Patent Office | 2020
|RECYCLING SOUNDPROOFING PANELS USING WASTE TIRES AND MANUFACTURING METHOD THEREOFF
European Patent Office | 2023
|METHOD FOR PRODUCING IMPROVED RUBBERIZED CONCRETE USING WASTE RUBBER TIRES
European Patent Office | 2015