Disclosed is a method for erecting a large-radian curved steel box girder bridge deck. The method comprises: improving a rear support system of a bridge girder erecting machine; arranging two rear support transverse moving traveling devices at a lower cross beam longitudinal moving wheel box group of a rear support leg; during curved hole passing of the bridge girder erecting machine, using a middle support point longitudinal moving wheel box and a power group, and a rear support longitudinal moving wheel box and a power group to enable a main girder to move on a middle support reverse riding wheel box, such that after a front support part of the main girder arrives above a front pier, a rear support point transversely adjusts the bridge girder erecting machine according to an oblique crossing angle; utilizing a front support oil cylinder to put a front lower cross beam in place, adjusting the height and level of the bridge girder erecting machine, and finally fixing the whole bridge girder erecting machine; and completing curved hole passing work and then enabling the beam to be erected. The present invention utilizes the lever principle to control the center of gravity of one end of the bridge girder erecting machine, so that the bridge girder erecting machine maintains its overall balance and completes large-radian curved hole passing.
L'invention concerne un procédé d'érection d'un tablier de pont de poutre-caisson en acier incurvé à grand radian. Le procédé comprend : l'amélioration d'un système de support arrière d'une machine de montage de poutre de pont ; l'agencement de deux dispositifs de déplacement transversal de support arrière au niveau d'un groupe de boîtes de roue à déplacement longitudinal de poutre transversale inférieure d'une jambe de support arrière ; pendant le passage d'un trou incurvé de la machine de montage de poutre de pont, à l'aide d'une boîte de roue à déplacement longitudinal à point de support intermédiaire et d'un groupe de puissance, et d'une boîte de roue à déplacement longitudinal de support arrière et un groupe d'alimentation pour permettre à une poutre principale de se déplacer sur une boîte de roue de marche arrière de support intermédiaire, de telle sorte qu'après qu'une partie de support avant de la poutre principale arrive au-dessus d'un pilier avant, un point de support arrière règle transversalement la machine de montage de poutre de pont selon un angle de croisement oblique ; l'utilisation d'un cylindre d'huile de support avant pour placer une traverse inférieure avant en place, l'ajustement de la hauteur et du niveau de la machine de montage de poutre de pont, et enfin la fixation de l'ensemble de la machine de montage de poutre de pont ; et l'achèvement du travail de passage de trou incurvé et ensuite l'habilitation à la poutre d'être érigée. La présente invention utilise le principe de levier pour commander le centre de gravité d'une extrémité de la machine de montage de poutre de pont, de telle sorte que la machine de montage de poutre de pont maintient son équilibre global et achève le passage d'un trou incurvé de grand radian.
本发明公开了一种大弧度曲线型钢箱梁桥面架设方法,对架桥机后支系统进行改进,在后支腿的下横梁纵移轮箱组处设置两个后支横移行走装置,在桥机曲线过孔时,依靠中支撑点纵移轮箱及动力组,后支纵移轮箱及动力组使得主梁在中支反托轮箱上移动,使得主梁的前支部分达到前桥墩上方后,后支撑点根据斜交角度横向调整架桥机,利用前支油缸将前下横梁放到位,调整桥机高度及水平,最终对整个桥机进行固定,曲线过孔工作完成,处于待架梁状态。本发明利用杠杆原理,控制架桥机一端的重心,让架桥机保持整体平衡,完成大弧度曲线过孔。
Disclosed is a method for erecting a large-radian curved steel box girder bridge deck. The method comprises: improving a rear support system of a bridge girder erecting machine; arranging two rear support transverse moving traveling devices at a lower cross beam longitudinal moving wheel box group of a rear support leg; during curved hole passing of the bridge girder erecting machine, using a middle support point longitudinal moving wheel box and a power group, and a rear support longitudinal moving wheel box and a power group to enable a main girder to move on a middle support reverse riding wheel box, such that after a front support part of the main girder arrives above a front pier, a rear support point transversely adjusts the bridge girder erecting machine according to an oblique crossing angle; utilizing a front support oil cylinder to put a front lower cross beam in place, adjusting the height and level of the bridge girder erecting machine, and finally fixing the whole bridge girder erecting machine; and completing curved hole passing work and then enabling the beam to be erected. The present invention utilizes the lever principle to control the center of gravity of one end of the bridge girder erecting machine, so that the bridge girder erecting machine maintains its overall balance and completes large-radian curved hole passing.
L'invention concerne un procédé d'érection d'un tablier de pont de poutre-caisson en acier incurvé à grand radian. Le procédé comprend : l'amélioration d'un système de support arrière d'une machine de montage de poutre de pont ; l'agencement de deux dispositifs de déplacement transversal de support arrière au niveau d'un groupe de boîtes de roue à déplacement longitudinal de poutre transversale inférieure d'une jambe de support arrière ; pendant le passage d'un trou incurvé de la machine de montage de poutre de pont, à l'aide d'une boîte de roue à déplacement longitudinal à point de support intermédiaire et d'un groupe de puissance, et d'une boîte de roue à déplacement longitudinal de support arrière et un groupe d'alimentation pour permettre à une poutre principale de se déplacer sur une boîte de roue de marche arrière de support intermédiaire, de telle sorte qu'après qu'une partie de support avant de la poutre principale arrive au-dessus d'un pilier avant, un point de support arrière règle transversalement la machine de montage de poutre de pont selon un angle de croisement oblique ; l'utilisation d'un cylindre d'huile de support avant pour placer une traverse inférieure avant en place, l'ajustement de la hauteur et du niveau de la machine de montage de poutre de pont, et enfin la fixation de l'ensemble de la machine de montage de poutre de pont ; et l'achèvement du travail de passage de trou incurvé et ensuite l'habilitation à la poutre d'être érigée. La présente invention utilise le principe de levier pour commander le centre de gravité d'une extrémité de la machine de montage de poutre de pont, de telle sorte que la machine de montage de poutre de pont maintient son équilibre global et achève le passage d'un trou incurvé de grand radian.
本发明公开了一种大弧度曲线型钢箱梁桥面架设方法,对架桥机后支系统进行改进,在后支腿的下横梁纵移轮箱组处设置两个后支横移行走装置,在桥机曲线过孔时,依靠中支撑点纵移轮箱及动力组,后支纵移轮箱及动力组使得主梁在中支反托轮箱上移动,使得主梁的前支部分达到前桥墩上方后,后支撑点根据斜交角度横向调整架桥机,利用前支油缸将前下横梁放到位,调整桥机高度及水平,最终对整个桥机进行固定,曲线过孔工作完成,处于待架梁状态。本发明利用杠杆原理,控制架桥机一端的重心,让架桥机保持整体平衡,完成大弧度曲线过孔。
METHOD FOR ERECTING LARGE-RADIAN CURVED STEEL BOX GIRDER BRIDGE DECK
PROCÉDÉ D'ÉRECTION DE TABLIER DE PONT DE POUTRE-CAISSON EN ACIER INCURVÉ À GRAND RADIAN
一种大弧度曲线型钢箱梁桥面架设方法
2022-02-24
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Erecting method of double-deck support-free steel truss girder
European Patent Office | 2023
|Method for erecting large road and bridge steel truss girder
European Patent Office | 2022
|