SUSPENSION CONNECTION NODE FOR LARGE-SPAN CANTILEVER STEEL TRUSS AND CONSTRUCTION METHOD THEREFOR
A suspension connection node for a large-span cantilever steel truss and a construction method therefor, the connection node comprising a steel pipe column (1), cantilever main beams (2), temporary steel tie rods (3) and fixed steel tie rods (4). A side end of the steel pipe column (1) is provided with steel corbels (11). The bottom end of each steel corbel (11) is provided with a column lug plate (12) along a vertical direction. The end of each steel corbel (11) away from the steel pipe column (1) is provided with a web (13). One end of each cantilever main beam (2) is connected to the webs (13). The end of each cantilever main beam (2) away from the steel pipe column (1) is provided with a beam node (21). The beam nodes (21) are used to connect side beams (22) perpendicular to the cantilever main beams (2). The top ends of the cantilever main beams (2) are fixedly provided with beam lug plates (23). Two ends of each temporary steel tie rod (3) are each fixedly provided with a connecting plate (31). The two connecting plates (31) are fixedly connected to one column lug plate (12) and one beam lug plate (23) respectively. The structure is constructed in order from bottom to top, the temporary steel tie rods (3) are used to assist the layer-by-layer installation and adjustment of the cantilever main beams (2), there is an extra layer of protection for component hoisting and, at the same time, operators have a working surface and safety protection. The suspension structure is constructed layer by layer in the order from bottom to top, thus facilitating component installation and increasing efficiency.
Est divulgué un nœud de raccord de suspension pour poutre d'acier triangulée en porte-à-faux à grande portée et son procédé de construction, le nœud comprenant une colonne de tuyau en acier (1), des poutres principales en porte-à-faux (2), des tirants en acier temporaires (3) et des tirants en acier fixes (4). Une extrémité latérale de la colonne de tuyau en acier (1) est pourvue de corbeaux en acier (11). L'extrémité inférieure de chaque corbeau en acier (11) est pourvue d'une plaque d'attache (12) de colonne dans la direction verticale. L'extrémité de chaque corbeau en acier (11) à l'opposé de la colonne de tuyau en acier (1) est pourvue d'une bande (13). Une extrémité de chaque poutre principale en porte-à-faux (2) est reliée aux bandes (13). L'extrémité de chaque poutre principale en porte-à-faux (2) à l'opposé de la colonne de tuyau en acier (1) est pourvue d'un nœud (21) de poutre. Les nœuds (21) de poutre sont utilisés pour relier des poutres latérales (22) perpendiculaires aux poutres principales en porte-à-faux (2). Les extrémités supérieures des poutres principales en porte-à-faux (2) sont pourvues de plaques d'attache (23) de poutre. Deux extrémités de chaque tirant en acier temporaire (3) sont chacune pourvues d'une plaque de raccord (31). Les deux plaques de raccord (31) sont reliées à demeure à une plaque d'attache (12) de colonne et à une plaque d'attache (23) de poutre respectivement. La structure est construite dans l'ordre de bas en haut, les tirants en acier temporaires (3) sont utilisés pour aider l'installation couche par couche et le réglage des poutres principales en porte-à-faux (2), il existe une couche de protection supplémentaire pour lever les éléments et, en même temps, les opérateurs ont une surface de travail et une protection de sécurité. La structure de suspension est construite couche par couche dans l'ordre de bas en haut, ce qui facilite l'installation des éléments et augmente l'efficacité.
一种用于大跨度悬挑钢桁架悬挂连接节点及其施工方法,连接节点包括钢管柱(1)、悬挑主梁(2)、临时钢拉杆(3)和固定钢拉杆(4),钢管柱(1)的侧端设置有钢牛腿(11),钢牛腿(11)的底端设置有沿竖向的柱耳板(12),钢牛腿(11)远离钢管柱(1)的一端设置有腹板(13),悬挑主梁(2)的一端连接在腹板(13)上,悬挑主梁(2)远离钢管柱(1)的一端设置有梁节点(21),梁节点(21)用于连接与悬挑主梁(2)垂直的边梁(22),悬挑主梁(2)的顶端固定设置有梁耳板(23),临时钢拉杆(3)的两端分别固定设置有连接板(31),两连接板(31)分别与柱耳板(12)和梁耳板(23)固定连接,结构由下至上顺向施工,采用临时钢拉杆(3)辅助进行悬挑主梁(2)的逐层安装、调节,构件吊装多了一层保护,同时作业人员有作业面和安全防护,悬挂结构采用自下而上的顺序逐层施工,便于构件安装,提高了效率。
SUSPENSION CONNECTION NODE FOR LARGE-SPAN CANTILEVER STEEL TRUSS AND CONSTRUCTION METHOD THEREFOR
A suspension connection node for a large-span cantilever steel truss and a construction method therefor, the connection node comprising a steel pipe column (1), cantilever main beams (2), temporary steel tie rods (3) and fixed steel tie rods (4). A side end of the steel pipe column (1) is provided with steel corbels (11). The bottom end of each steel corbel (11) is provided with a column lug plate (12) along a vertical direction. The end of each steel corbel (11) away from the steel pipe column (1) is provided with a web (13). One end of each cantilever main beam (2) is connected to the webs (13). The end of each cantilever main beam (2) away from the steel pipe column (1) is provided with a beam node (21). The beam nodes (21) are used to connect side beams (22) perpendicular to the cantilever main beams (2). The top ends of the cantilever main beams (2) are fixedly provided with beam lug plates (23). Two ends of each temporary steel tie rod (3) are each fixedly provided with a connecting plate (31). The two connecting plates (31) are fixedly connected to one column lug plate (12) and one beam lug plate (23) respectively. The structure is constructed in order from bottom to top, the temporary steel tie rods (3) are used to assist the layer-by-layer installation and adjustment of the cantilever main beams (2), there is an extra layer of protection for component hoisting and, at the same time, operators have a working surface and safety protection. The suspension structure is constructed layer by layer in the order from bottom to top, thus facilitating component installation and increasing efficiency.
Est divulgué un nœud de raccord de suspension pour poutre d'acier triangulée en porte-à-faux à grande portée et son procédé de construction, le nœud comprenant une colonne de tuyau en acier (1), des poutres principales en porte-à-faux (2), des tirants en acier temporaires (3) et des tirants en acier fixes (4). Une extrémité latérale de la colonne de tuyau en acier (1) est pourvue de corbeaux en acier (11). L'extrémité inférieure de chaque corbeau en acier (11) est pourvue d'une plaque d'attache (12) de colonne dans la direction verticale. L'extrémité de chaque corbeau en acier (11) à l'opposé de la colonne de tuyau en acier (1) est pourvue d'une bande (13). Une extrémité de chaque poutre principale en porte-à-faux (2) est reliée aux bandes (13). L'extrémité de chaque poutre principale en porte-à-faux (2) à l'opposé de la colonne de tuyau en acier (1) est pourvue d'un nœud (21) de poutre. Les nœuds (21) de poutre sont utilisés pour relier des poutres latérales (22) perpendiculaires aux poutres principales en porte-à-faux (2). Les extrémités supérieures des poutres principales en porte-à-faux (2) sont pourvues de plaques d'attache (23) de poutre. Deux extrémités de chaque tirant en acier temporaire (3) sont chacune pourvues d'une plaque de raccord (31). Les deux plaques de raccord (31) sont reliées à demeure à une plaque d'attache (12) de colonne et à une plaque d'attache (23) de poutre respectivement. La structure est construite dans l'ordre de bas en haut, les tirants en acier temporaires (3) sont utilisés pour aider l'installation couche par couche et le réglage des poutres principales en porte-à-faux (2), il existe une couche de protection supplémentaire pour lever les éléments et, en même temps, les opérateurs ont une surface de travail et une protection de sécurité. La structure de suspension est construite couche par couche dans l'ordre de bas en haut, ce qui facilite l'installation des éléments et augmente l'efficacité.
一种用于大跨度悬挑钢桁架悬挂连接节点及其施工方法,连接节点包括钢管柱(1)、悬挑主梁(2)、临时钢拉杆(3)和固定钢拉杆(4),钢管柱(1)的侧端设置有钢牛腿(11),钢牛腿(11)的底端设置有沿竖向的柱耳板(12),钢牛腿(11)远离钢管柱(1)的一端设置有腹板(13),悬挑主梁(2)的一端连接在腹板(13)上,悬挑主梁(2)远离钢管柱(1)的一端设置有梁节点(21),梁节点(21)用于连接与悬挑主梁(2)垂直的边梁(22),悬挑主梁(2)的顶端固定设置有梁耳板(23),临时钢拉杆(3)的两端分别固定设置有连接板(31),两连接板(31)分别与柱耳板(12)和梁耳板(23)固定连接,结构由下至上顺向施工,采用临时钢拉杆(3)辅助进行悬挑主梁(2)的逐层安装、调节,构件吊装多了一层保护,同时作业人员有作业面和安全防护,悬挂结构采用自下而上的顺序逐层施工,便于构件安装,提高了效率。
SUSPENSION CONNECTION NODE FOR LARGE-SPAN CANTILEVER STEEL TRUSS AND CONSTRUCTION METHOD THEREFOR
NŒUD DE RACCORD DE SUSPENSION POUR POUTRE D'ACIER TRIANGULÉE EN PORTE-À-FAUX À GRANDE PORTÉE ET SON PROCÉDÉ DE CONSTRUCTION
一种用于大跨度悬挑钢桁架悬挂连接节点及其施工方法
WANG XINPENG (author) / ZHANG KUI (author) / ZHENG YONGCHAO (author) / ZAHNG WANHONG (author) / LIU DAWEI (author) / LUO DEJUN (author) / ZHANG NAN (author) / RAN XINGCHEN (author) / HU XIANGSONG (author) / TANG YUANJIN (author)
2022-03-31
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Large-span steel truss girder single-cantilever construction method
European Patent Office | 2020
|Construction method of large-span heavy cantilever truss
European Patent Office | 2021
|Large-span deck type continuous steel truss cantilever erection construction method
European Patent Office | 2020
|Large-span cantilever truss structure and construction method thereof
European Patent Office | 2022
|Construction method for large-span cantilever steel truss structure in limited space
European Patent Office | 2024
|