A platform for research: civil engineering, architecture and urbanism
ROADBED IMPROVEMENT DEVICE
A roadbed improvement device, comprising a base (100), a first chemical liquid supply device (210) and a drilling device (300). The base (100) is connected to a material blocking member. A first cavity (110) which communicates the upper and lower sides of the base (100) is provided on a side of the base (100) on which the material blocking member is located. The first cavity (110) communicates with the upper and lower sides of the base (100). The first chemical liquid supply device (210) is connected to the base (100) and is located above the first cavity (110). The first chemical liquid supply device (210) is used for injecting a chemical liquid to the first cavity (110). The drilling device (300) comprises a drill bit body (310) and a drill bit (330). The drill bit body (310) is connected to the base (100). The drill bit body (310) is used for driving the drill bit (330) to rotate and move in the up and down directions. The drill bit (330) passes through a drill bit hole (160) on the base (100). The material blocking member can enable roadbed soil material drilled by the drill bit (330) to approach the middle from both sides of the drill bit (330), thereby completing the burying of the soil material. The device can increase construction efficiency.
Dispositif d'amélioration de plateforme, comprenant une base (100), un premier dispositif d'alimentation en liquide chimique (210) et un dispositif de perçage (300). La base (100) est reliée à un élément de blocage de matériau. Une première cavité (110) qui fait communiquer les côtés supérieur et inférieur de la base (100) est disposée sur un côté de la base (100) sur lequel se trouve l'élément de blocage de matériau. La première cavité (110) communique avec les côtés supérieur et inférieur de la base (100). Le premier dispositif d'alimentation en liquide chimique (210) est relié à la base (100) et se trouve au-dessus de la première cavité (110). Le premier dispositif d'alimentation en liquide chimique (210) est utilisé pour injecter un liquide chimique dans la première cavité (110). Le dispositif de perçage (300) comprend un corps (310) de foret et un foret (330). Le corps (310) de foret est relié à la base (100). Le corps (310) de foret est utilisé pour amener le foret (330) à tourner et à se déplacer vers le haut et vers le bas. Le foret (330) passe à travers un trou (160) de foret sur la base (100). L'élément de blocage de matériau peut permettre à un matériau de sol de plateforme foré par le foret (330) d'approcher du milieu des deux côtés du foret (330), ce qui permet d'achever l'enfouissement du matériau de sol. Le dispositif peut augmenter l'efficience de construction.
一种路基改良装置,包括底座(100)、第一化学液供给装置(210)与钻地装置(300),底座(100)上连接有挡料件,底座(100)在挡料件的一侧设置有连通底座(100)的上下两侧第一空腔(110),第一空腔(110)连通底座(100)的上下两侧,第一化学液供给装置(210)与底座(100)连接并位于第一空腔(110)上方,第一化学液供给装置(210)用于向第一空腔(110)注入化学液,钻地装置(300)包括钻头机身(310)与钻头(330),钻头机身(310)与底座(100)连接,钻头机身(310)用于驱动钻头(330)转动并沿上下方向移动,钻头(330)穿过底座(100)上的钻头孔(160),挡料件能够使钻头(330)钻开的路基土料自钻头(330)两侧向中间靠拢,从而完成土料掩埋。该装置可提高施工效率。
ROADBED IMPROVEMENT DEVICE
A roadbed improvement device, comprising a base (100), a first chemical liquid supply device (210) and a drilling device (300). The base (100) is connected to a material blocking member. A first cavity (110) which communicates the upper and lower sides of the base (100) is provided on a side of the base (100) on which the material blocking member is located. The first cavity (110) communicates with the upper and lower sides of the base (100). The first chemical liquid supply device (210) is connected to the base (100) and is located above the first cavity (110). The first chemical liquid supply device (210) is used for injecting a chemical liquid to the first cavity (110). The drilling device (300) comprises a drill bit body (310) and a drill bit (330). The drill bit body (310) is connected to the base (100). The drill bit body (310) is used for driving the drill bit (330) to rotate and move in the up and down directions. The drill bit (330) passes through a drill bit hole (160) on the base (100). The material blocking member can enable roadbed soil material drilled by the drill bit (330) to approach the middle from both sides of the drill bit (330), thereby completing the burying of the soil material. The device can increase construction efficiency.
Dispositif d'amélioration de plateforme, comprenant une base (100), un premier dispositif d'alimentation en liquide chimique (210) et un dispositif de perçage (300). La base (100) est reliée à un élément de blocage de matériau. Une première cavité (110) qui fait communiquer les côtés supérieur et inférieur de la base (100) est disposée sur un côté de la base (100) sur lequel se trouve l'élément de blocage de matériau. La première cavité (110) communique avec les côtés supérieur et inférieur de la base (100). Le premier dispositif d'alimentation en liquide chimique (210) est relié à la base (100) et se trouve au-dessus de la première cavité (110). Le premier dispositif d'alimentation en liquide chimique (210) est utilisé pour injecter un liquide chimique dans la première cavité (110). Le dispositif de perçage (300) comprend un corps (310) de foret et un foret (330). Le corps (310) de foret est relié à la base (100). Le corps (310) de foret est utilisé pour amener le foret (330) à tourner et à se déplacer vers le haut et vers le bas. Le foret (330) passe à travers un trou (160) de foret sur la base (100). L'élément de blocage de matériau peut permettre à un matériau de sol de plateforme foré par le foret (330) d'approcher du milieu des deux côtés du foret (330), ce qui permet d'achever l'enfouissement du matériau de sol. Le dispositif peut augmenter l'efficience de construction.
一种路基改良装置,包括底座(100)、第一化学液供给装置(210)与钻地装置(300),底座(100)上连接有挡料件,底座(100)在挡料件的一侧设置有连通底座(100)的上下两侧第一空腔(110),第一空腔(110)连通底座(100)的上下两侧,第一化学液供给装置(210)与底座(100)连接并位于第一空腔(110)上方,第一化学液供给装置(210)用于向第一空腔(110)注入化学液,钻地装置(300)包括钻头机身(310)与钻头(330),钻头机身(310)与底座(100)连接,钻头机身(310)用于驱动钻头(330)转动并沿上下方向移动,钻头(330)穿过底座(100)上的钻头孔(160),挡料件能够使钻头(330)钻开的路基土料自钻头(330)两侧向中间靠拢,从而完成土料掩埋。该装置可提高施工效率。
ROADBED IMPROVEMENT DEVICE
DISPOSITIF D'AMÉLIORATION DE PLATEFORME
路基改良装置
CHANG JIAJIA (author) / GAO YONGGANG (author) / SHEN HONGYU (author) / ZHU SHAOHUI (author) / CHEN ZHENGUO (author) / SUN YINGWU (author) / QI JIANGUO (author) / LIU CUI (author) / LI LONGFEI (author) / YANG SIJIE (author)
2022-10-06
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE