DEEPWATER GROUP PILE FOUNDATION
A deepwater group pile foundation, comprising: multiple drilled piles (100), the cross-sectional shape of pile tops (100a) of the drilled piles (100) being a square provided with an arc chamfer, a first reinforcement cage (103) being pre-embedded at the interior of each pile top (100a), the cross-sectional shape of the first reinforcement cages (103) being the same as the cross-sectional shape of the pile tops (100a), and the first reinforcement cages (103) each comprising multiple first vertical main ribs (103a) arranged at even intervals; a bearing platform (200), the bearing platform (200) being fixed above the drilled piles (100), multiple horizontal steel reinforcing bars (105) being provided in the bottom part of the bearing platform (200), the upper ends of the first vertical main ribs (103a) being vertically inserted into the bearing platform (200), and the horizontal steel reinforcing bars (105) within the width range of the first reinforcement cages (103) each passing through gaps between two adjacent first vertical main ribs (103a); and bottom sealing concrete (300), the bottom sealing concrete (300) being located within the height range of the pile tops (100a) below the bearing platform (200).
L'invention concerne une fondation sur palée en eau profonde, comprenant : de multiples pieux forés (100), la forme en coupe transversale des sommets des pieux (100a) des pieux forés (100) étant un carré pourvu d'un chanfrein d'arc, une première cage de renfort (103) étant pré-incorporée à l'intérieur de chaque sommet de pieu (100a), la forme en coupe transversale des premières cages de renfort (103) étant la même que la forme en coupe transversale des sommets de pieux (100a), et les premières cages de renfort (103) comprenant chacune de multiples premières nervures principales verticales (103a) disposées à des intervalles réguliers ; une plateforme de support (200) fixée au-dessus des pieux forés (100), de multiples barres de renfort en acier horizontales (105) étant disposées dans la partie inférieure de la plateforme de support (200), les extrémités supérieures des premières nervures principales verticales (103a) étant insérées verticalement dans la plateforme de support (200), et les barres de renfort en acier horizontales (105) dans la plage de largeur des premières cages de renfort (103) passant chacun à travers des espaces entre deux premières nervures principales verticales adjacentes (103a) ; et du béton de scellement inférieur (300) situé à l'intérieur de la plage de hauteur des sommets de pieu (100a) au-dessous de la plateforme de support (200).
一种深水群桩基础,其包括:多根钻孔桩(100),钻孔桩(100)的桩顶(100a)横截面形状为带圆弧倒角的正方形,桩顶(100a)内部预埋有第一钢筋笼(103),第一钢筋笼(103)的横截面形状与桩顶(100a)的横截面形状相同,第一钢筋笼(103)包括均匀间隔设置的多根第一竖直主筋(103a);承台(200),承台(200)固定于钻孔桩(100)上方,承台(200)底部内设有多根水平钢筋(105),第一竖直主筋(103a)的上端垂直插入承台(200)内,且第一钢筋笼(103)宽度范围内的水平钢筋(105)分别从相邻两根第一竖直主筋(103a)之间的间隙穿过;封底混凝土(300),封底混凝土(300)位于承台(200)下方的桩顶(100a)高度范围内。
DEEPWATER GROUP PILE FOUNDATION
A deepwater group pile foundation, comprising: multiple drilled piles (100), the cross-sectional shape of pile tops (100a) of the drilled piles (100) being a square provided with an arc chamfer, a first reinforcement cage (103) being pre-embedded at the interior of each pile top (100a), the cross-sectional shape of the first reinforcement cages (103) being the same as the cross-sectional shape of the pile tops (100a), and the first reinforcement cages (103) each comprising multiple first vertical main ribs (103a) arranged at even intervals; a bearing platform (200), the bearing platform (200) being fixed above the drilled piles (100), multiple horizontal steel reinforcing bars (105) being provided in the bottom part of the bearing platform (200), the upper ends of the first vertical main ribs (103a) being vertically inserted into the bearing platform (200), and the horizontal steel reinforcing bars (105) within the width range of the first reinforcement cages (103) each passing through gaps between two adjacent first vertical main ribs (103a); and bottom sealing concrete (300), the bottom sealing concrete (300) being located within the height range of the pile tops (100a) below the bearing platform (200).
L'invention concerne une fondation sur palée en eau profonde, comprenant : de multiples pieux forés (100), la forme en coupe transversale des sommets des pieux (100a) des pieux forés (100) étant un carré pourvu d'un chanfrein d'arc, une première cage de renfort (103) étant pré-incorporée à l'intérieur de chaque sommet de pieu (100a), la forme en coupe transversale des premières cages de renfort (103) étant la même que la forme en coupe transversale des sommets de pieux (100a), et les premières cages de renfort (103) comprenant chacune de multiples premières nervures principales verticales (103a) disposées à des intervalles réguliers ; une plateforme de support (200) fixée au-dessus des pieux forés (100), de multiples barres de renfort en acier horizontales (105) étant disposées dans la partie inférieure de la plateforme de support (200), les extrémités supérieures des premières nervures principales verticales (103a) étant insérées verticalement dans la plateforme de support (200), et les barres de renfort en acier horizontales (105) dans la plage de largeur des premières cages de renfort (103) passant chacun à travers des espaces entre deux premières nervures principales verticales adjacentes (103a) ; et du béton de scellement inférieur (300) situé à l'intérieur de la plage de hauteur des sommets de pieu (100a) au-dessous de la plateforme de support (200).
一种深水群桩基础,其包括:多根钻孔桩(100),钻孔桩(100)的桩顶(100a)横截面形状为带圆弧倒角的正方形,桩顶(100a)内部预埋有第一钢筋笼(103),第一钢筋笼(103)的横截面形状与桩顶(100a)的横截面形状相同,第一钢筋笼(103)包括均匀间隔设置的多根第一竖直主筋(103a);承台(200),承台(200)固定于钻孔桩(100)上方,承台(200)底部内设有多根水平钢筋(105),第一竖直主筋(103a)的上端垂直插入承台(200)内,且第一钢筋笼(103)宽度范围内的水平钢筋(105)分别从相邻两根第一竖直主筋(103a)之间的间隙穿过;封底混凝土(300),封底混凝土(300)位于承台(200)下方的桩顶(100a)高度范围内。
DEEPWATER GROUP PILE FOUNDATION
FONDATION SUR PALÉE EN EAU PROFONDE
一种深水群桩基础
XIAO HAIZHU (author) / QIU YUANXI (author) / YUAN RENAN (author) / GAO ZONGYU (author) / LIU JUNFENG (author) / PAN TAO (author) / HE DONGSHENG (author) / LI HUAYUN (author) / FENG LONGXING (author) / TAN GUOHONG (author)
2023-02-09
Patent
Electronic Resource
Chinese
Deepwater pile group foundation reinforcement cage and design method thereof
European Patent Office | 2023
|Computation of Dynamic Characteristics of Deepwater Group Pile Foundation for Bridges
British Library Conference Proceedings | 2011
|Computation of Dynamic Characteristics of Deepwater Group Pile Foundation for Bridges
Trans Tech Publications | 2011
|