A platform for research: civil engineering, architecture and urbanism
PREFABRICATED ASSEMBLY CORRUGATED STEEL WEB COMPOSITE BRIDGE, AND CANTILEVER CONSTRUCTION METHOD THEREOF
A prefabricated assembly corrugated steel web composite bridge, and a cantilever construction method thereof. The bridge comprises: corrugated steel webs (3), which are of corrugated structures and have a certain thickness; corrugated I-shaped steel concrete bottom plates (5) which are disposed at the bottom of the corrugated steel webs (3), are of square structures, and have side inclination angles; outer support brackets (6) which are disposed on the inner sides of the corrugated I-shaped steel concrete bottom plates (5); a prefabricated UHPC plate (7) which is supported by the outer support brackets (6), where a plurality of corrugated structures are provided on the surfaces, the bottom parts on the two sides protrude, and spaces on inclined plates of the corrugated structures are reserved for the installation of bent steel bars; the prefabricated UHPC plate (7) is glued with the corrugated I-shaped steel concrete lower flange bottom plates (5) and the outer support brackets (6) by means of epoxy glue; a cast-in-place concrete layer (8) which is laid on the prefabricated UHPC plate (7) and fixed to the bottom of the corrugated I-shaped steel concrete bottom plates (5) by means of anchoring steel bars (9); and prefabricated concrete top plates (1) which are supported by the corrugated steel webs (3).
L'invention concerne un pont composite en bandes d'acier ondulées à assemblage préfabriqué, et son procédé de construction en porte-à-faux. Le pont comprend : des bandes d'acier ondulées (3), qui sont d'une structure ondulée et ont une certaine épaisseur; des plaques inférieures en béton armé en forme de I ondulées (5) qui sont disposées au fond des bandes d'acier ondulées (3), sont d'une structure carrée, et ont des angles d'inclinaison latéraux; des pièces de support externes (6) qui sont disposées sur les côtés internes des plaques inférieures en béton armé en forme de I ondulées (5); une plaque UHPC préfabriquée (7) qui est supportée par les pièces de support externes (6), une pluralité de structures ondulées étant disposées sur les surfaces, les parties inférieures sur les deux côtés font saillie, et des espaces sur des plaques inclinées des structures ondulées sont réservés pour l'installation de barres d'acier pliées; la plaque UHPC préfabriquée (7) est collée avec les plaques inférieures de bride inférieure en béton armé en forme de I ondulées (5) et les pièces de support externes (6) au moyen d'une colle époxy; une couche de béton coulé sur place (8) qui est posée sur la plaque UHPC préfabriquée (7) et fixée au fond des plaques inférieures en béton armé en forme de I ondulées (5) au moyen de barres d'acier d'ancrage (9); et des plaques supérieures préfabriquées en béton (1) qui sont supportées par les bandes d'acier ondulées (3).
一种预制拼装波形钢腹板组合桥梁及其悬臂施工方法。桥梁包括:波形钢腹板(3),为波纹型结构,具有一定厚度;波形工字钢混凝土底板(5),设置在波形钢腹板(3)底部,为方体结构,侧边设置有倾角;外托(6),设置在波形工字钢混凝土底板(5)内侧;预制UHPC板(7),受外托(6)支撑,表面设置若干波纹状结构,两侧底部凸出,波纹状结构斜板处预留弯曲钢筋;预制UHPC板(7)通过环氧树脂胶与波形工字钢下翼缘混凝土底板(5)以及外托(6)胶接;现浇混凝土板(8),铺放在预制UHPC板(7)上,通过锚固钢筋(9)与波形工字钢混凝土底板(5)底部固定;预制混凝土顶板(1),由波形钢腹板(3)支撑。
PREFABRICATED ASSEMBLY CORRUGATED STEEL WEB COMPOSITE BRIDGE, AND CANTILEVER CONSTRUCTION METHOD THEREOF
A prefabricated assembly corrugated steel web composite bridge, and a cantilever construction method thereof. The bridge comprises: corrugated steel webs (3), which are of corrugated structures and have a certain thickness; corrugated I-shaped steel concrete bottom plates (5) which are disposed at the bottom of the corrugated steel webs (3), are of square structures, and have side inclination angles; outer support brackets (6) which are disposed on the inner sides of the corrugated I-shaped steel concrete bottom plates (5); a prefabricated UHPC plate (7) which is supported by the outer support brackets (6), where a plurality of corrugated structures are provided on the surfaces, the bottom parts on the two sides protrude, and spaces on inclined plates of the corrugated structures are reserved for the installation of bent steel bars; the prefabricated UHPC plate (7) is glued with the corrugated I-shaped steel concrete lower flange bottom plates (5) and the outer support brackets (6) by means of epoxy glue; a cast-in-place concrete layer (8) which is laid on the prefabricated UHPC plate (7) and fixed to the bottom of the corrugated I-shaped steel concrete bottom plates (5) by means of anchoring steel bars (9); and prefabricated concrete top plates (1) which are supported by the corrugated steel webs (3).
L'invention concerne un pont composite en bandes d'acier ondulées à assemblage préfabriqué, et son procédé de construction en porte-à-faux. Le pont comprend : des bandes d'acier ondulées (3), qui sont d'une structure ondulée et ont une certaine épaisseur; des plaques inférieures en béton armé en forme de I ondulées (5) qui sont disposées au fond des bandes d'acier ondulées (3), sont d'une structure carrée, et ont des angles d'inclinaison latéraux; des pièces de support externes (6) qui sont disposées sur les côtés internes des plaques inférieures en béton armé en forme de I ondulées (5); une plaque UHPC préfabriquée (7) qui est supportée par les pièces de support externes (6), une pluralité de structures ondulées étant disposées sur les surfaces, les parties inférieures sur les deux côtés font saillie, et des espaces sur des plaques inclinées des structures ondulées sont réservés pour l'installation de barres d'acier pliées; la plaque UHPC préfabriquée (7) est collée avec les plaques inférieures de bride inférieure en béton armé en forme de I ondulées (5) et les pièces de support externes (6) au moyen d'une colle époxy; une couche de béton coulé sur place (8) qui est posée sur la plaque UHPC préfabriquée (7) et fixée au fond des plaques inférieures en béton armé en forme de I ondulées (5) au moyen de barres d'acier d'ancrage (9); et des plaques supérieures préfabriquées en béton (1) qui sont supportées par les bandes d'acier ondulées (3).
一种预制拼装波形钢腹板组合桥梁及其悬臂施工方法。桥梁包括:波形钢腹板(3),为波纹型结构,具有一定厚度;波形工字钢混凝土底板(5),设置在波形钢腹板(3)底部,为方体结构,侧边设置有倾角;外托(6),设置在波形工字钢混凝土底板(5)内侧;预制UHPC板(7),受外托(6)支撑,表面设置若干波纹状结构,两侧底部凸出,波纹状结构斜板处预留弯曲钢筋;预制UHPC板(7)通过环氧树脂胶与波形工字钢下翼缘混凝土底板(5)以及外托(6)胶接;现浇混凝土板(8),铺放在预制UHPC板(7)上,通过锚固钢筋(9)与波形工字钢混凝土底板(5)底部固定;预制混凝土顶板(1),由波形钢腹板(3)支撑。
PREFABRICATED ASSEMBLY CORRUGATED STEEL WEB COMPOSITE BRIDGE, AND CANTILEVER CONSTRUCTION METHOD THEREOF
PONT COMPOSITE EN BANDES D'ACIER ONDULÉES À ASSEMBLAGE PRÉFABRIQUÉ ET SON PROCÉDÉ DE CONSTRUCTION EN PORTE-À-FAUX
一种预制拼装波形钢腹板组合桥梁及其悬臂施工方法
LIU DUO (author) / ZHANG JIANDONG (author) / CHEN JIAFU (author) / DENG WENQIN (author) / LI SISHENG (author) / ZHA SHANG (author) / TANG XIANYUN (author) / CHENG ZHAOHENG (author) / CAO XUEYONG (author) / LU YAOQING (author)
2023-02-09
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2021
|Prefabricated corrugated steel web composite beam bridge and construction method thereof
European Patent Office | 2021
|Prefabricated corrugated steel web assembled bridge and construction method thereof
European Patent Office | 2024
|Short-line construction method for prefabricated assembly construction corrugated steel web bridge
European Patent Office | 2020
|Prefabricated corrugated steel-concrete deck type bridge and construction method thereof
European Patent Office | 2022
|