A platform for research: civil engineering, architecture and urbanism
STEEL BOX GIRDER STRUCTURE AND CONSTRUCTION METHOD THEREFOR
Disclosed in the present application are a steel box girder structure and a construction method therefor. The steel box girder structure comprises a first steel box girder, a first prefabricated bearing base, a second steel box girder, a second prefabricated bearing base, and a pre-tightened steel cable, wherein the first prefabricated bearing base is arranged on the first steel box girder; the second steel box girder is configured to be subjected to closure construction with the first steel box girder to form a closure segment; the second prefabricated bearing base is arranged on the second steel box girder; and a first end of the pre-tightened steel cable is connected to the first prefabricated bearing base, and a second end of the pre-tightened steel cable is connected to the second prefabricated bearing base.
La présente invention concerne une structure de poutre caisson en acier et son procédé de construction. La structure de poutre caisson en acier comprend une première poutre caisson en acier, une première base de palier préfabriquée, une seconde poutre caisson en acier, une seconde base de palier préfabriquée, et un câble en acier pré-tendu ; la première base de palier préfabriquée est disposée sur la première poutre caisson en acier ; la seconde poutre caisson en acier est conçue pour être soumise à une construction de clôture avec la première poutre caisson en acier pour former un segment de clôture ; la seconde base de palier préfabriquée est disposée sur la seconde poutre caisson en acier ; et une première extrémité du câble en acier pré-tendu est reliée à la première base de palier préfabriquée, et une seconde extrémité du câble en acier pré-tendu est reliée à la seconde base de palier préfabriquée.
本申请公开一种钢箱梁结构及施工方法。所述钢箱梁结构包括第一钢箱梁、第一预制承载座、第二钢箱梁、第二预制承载座和预紧钢索,第一预制承载座设置于第一钢箱梁上,第二钢箱梁被设置为与第一钢箱梁进行合龙施工形成合龙段,第二预制承载座设置于第二钢箱梁上,预紧钢索的第一端与第一预制承载座连接,第二端与第二预制承载座连接。
STEEL BOX GIRDER STRUCTURE AND CONSTRUCTION METHOD THEREFOR
Disclosed in the present application are a steel box girder structure and a construction method therefor. The steel box girder structure comprises a first steel box girder, a first prefabricated bearing base, a second steel box girder, a second prefabricated bearing base, and a pre-tightened steel cable, wherein the first prefabricated bearing base is arranged on the first steel box girder; the second steel box girder is configured to be subjected to closure construction with the first steel box girder to form a closure segment; the second prefabricated bearing base is arranged on the second steel box girder; and a first end of the pre-tightened steel cable is connected to the first prefabricated bearing base, and a second end of the pre-tightened steel cable is connected to the second prefabricated bearing base.
La présente invention concerne une structure de poutre caisson en acier et son procédé de construction. La structure de poutre caisson en acier comprend une première poutre caisson en acier, une première base de palier préfabriquée, une seconde poutre caisson en acier, une seconde base de palier préfabriquée, et un câble en acier pré-tendu ; la première base de palier préfabriquée est disposée sur la première poutre caisson en acier ; la seconde poutre caisson en acier est conçue pour être soumise à une construction de clôture avec la première poutre caisson en acier pour former un segment de clôture ; la seconde base de palier préfabriquée est disposée sur la seconde poutre caisson en acier ; et une première extrémité du câble en acier pré-tendu est reliée à la première base de palier préfabriquée, et une seconde extrémité du câble en acier pré-tendu est reliée à la seconde base de palier préfabriquée.
本申请公开一种钢箱梁结构及施工方法。所述钢箱梁结构包括第一钢箱梁、第一预制承载座、第二钢箱梁、第二预制承载座和预紧钢索,第一预制承载座设置于第一钢箱梁上,第二钢箱梁被设置为与第一钢箱梁进行合龙施工形成合龙段,第二预制承载座设置于第二钢箱梁上,预紧钢索的第一端与第一预制承载座连接,第二端与第二预制承载座连接。
STEEL BOX GIRDER STRUCTURE AND CONSTRUCTION METHOD THEREFOR
STRUCTURE DE POUTRE CAISSON EN ACIER ET SON PROCÉDÉ DE CONSTRUCTION
一种钢箱梁结构及施工方法
2023-03-09
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
RC CONSTRUCTION METHOD OF GIRDER AND GIRDER OPENING THEREFOR
European Patent Office | 2018
|COMBINED BOX GIRDER STRUCTURE AND CONSTRUCTION METHOD THEREFOR
European Patent Office | 2023
|COMPOSITE BOX GIRDER STRUCTURE AND CONSTRUCTION METHOD THEREFOR
European Patent Office | 2023
|TRUSS GIRDER WITH DOUBLE STEEL PIPE UPPER STRUCTURE AND CONSTRUCTION METHOD THEREFOR
European Patent Office | 2018
|Steel truss girder construction method, steel truss girder and bridge structure
European Patent Office | 2024
|