Disclosed is a method for building a platform for construction of cast-in-place piles of a high-piled wharf, comprising the following steps: building a cantilever platform, constructing and erecting steel casings located on a non-revetment riprap foundation bed, building a construction platform of a bank connecting section of a platform area, building a construction platform of a first section of a public road area, building a construction platform of a second section of the public road area, and building a construction platform of a standard section. The cantilever platform is used for implanting construction of steel casings of a first column of pile foundations in the platform area and in the public road area; the construction platform of the bank connecting section of the platform area corresponds to the first to third columns of pile foundations of the platform area, the construction platform of the first section of the public road area corresponds to the first to ninth cast-in-place piles of the three columns of pile foundations of the public road area, and the construction platform of the second section of the public road area corresponds to the tenth to twentieth cast-in-place piles of the three columns of pile foundations of the public road area; and the construction platform of the standard section corresponds to the fourth column of pile foundations in the platform area to the nineteenth column of pile foundations in a wharf area. According to the present invention, the safety and stability of existing wharfs and revetments can be protected.
La présente invention divulgue un procédé permettant de construire une plate-forme pour la construction de pieux coulés sur place d'un quai à empilement élevé, comprenant les étapes suivantes consistant : à construire une plate-forme en porte-à-faux, à construire et à ériger des banches en acier situées sur un lit de fondation par enrochement sans revêtement, à construire une plate-forme de construction d'une section de raccordement à une rive d'une zone de plate-forme, à construire une plate-forme de construction d'une première section d'une zone de route publique, à construire une plate-forme de construction d'une seconde section de la zone de route publique et à construire une plate-forme de construction d'une section standard. La plate-forme en porte-à-faux est utilisée pour implanter la construction de banches en acier d'une première colonne de fondations de pieu dans la zone de plate-forme et dans la zone de route publique ; la plate-forme de construction de la section de raccordement à une rive de la zone de plate-forme correspond aux première à troisième colonnes de fondations de pieu de la zone de plate-forme, la plate-forme de construction de la première section de la zone de route publique correspond aux premier à neuvième pieux coulés sur place des trois colonnes de fondations de pieu de la zone de route publique et la plate-forme de construction de la seconde section de la zone de route publique correspond au dixième à vingtième pieux coulés sur place des trois colonnes de fondations de pieu de la zone de route publique ; et la plate-forme de construction de la section standard correspond à la quatrième colonne de fondations de pieu dans la zone de plate-forme à la dix-neuvième colonne de fondations de pieu dans une zone de quai. Selon la présente invention, la sécurité et la stabilité des quais et des revêtements existants peuvent être protégées.
本发明公开了一种高桩码头灌注桩施工用平台的搭设方法,包括以下流程:悬挑平台搭设、施打位于非护岸抛石基床上的钢护筒、平台区接岸段施工平台搭设、公共道路区第一分段施工平台搭设、公共道路区第二分段施工平台搭设、标准段施工平台搭设。悬挑平台用于平台区和公共道路区的第1列桩基的钢护筒的植入施工;平台区接岸段施工平台与平台区的第1列至第3列桩基对应,公共道路区第一分段施工平台与公共道路区的3列桩基的第1根至第9根灌注桩对应,公共道路区第二分段施工平台与公共道路区的3列桩基的第10根至第20根灌注桩对应;标准段施工平台与平台区的第4列桩基至码头区的第19列桩基对应。本发明能保护既有码头和护岸的安全稳定。
METHOD FOR BUILDING PLATFORM FOR CONSTRUCTION OF CAST-IN-PLACE PILES OF HIGH-PILED WHARF
Disclosed is a method for building a platform for construction of cast-in-place piles of a high-piled wharf, comprising the following steps: building a cantilever platform, constructing and erecting steel casings located on a non-revetment riprap foundation bed, building a construction platform of a bank connecting section of a platform area, building a construction platform of a first section of a public road area, building a construction platform of a second section of the public road area, and building a construction platform of a standard section. The cantilever platform is used for implanting construction of steel casings of a first column of pile foundations in the platform area and in the public road area; the construction platform of the bank connecting section of the platform area corresponds to the first to third columns of pile foundations of the platform area, the construction platform of the first section of the public road area corresponds to the first to ninth cast-in-place piles of the three columns of pile foundations of the public road area, and the construction platform of the second section of the public road area corresponds to the tenth to twentieth cast-in-place piles of the three columns of pile foundations of the public road area; and the construction platform of the standard section corresponds to the fourth column of pile foundations in the platform area to the nineteenth column of pile foundations in a wharf area. According to the present invention, the safety and stability of existing wharfs and revetments can be protected.
La présente invention divulgue un procédé permettant de construire une plate-forme pour la construction de pieux coulés sur place d'un quai à empilement élevé, comprenant les étapes suivantes consistant : à construire une plate-forme en porte-à-faux, à construire et à ériger des banches en acier situées sur un lit de fondation par enrochement sans revêtement, à construire une plate-forme de construction d'une section de raccordement à une rive d'une zone de plate-forme, à construire une plate-forme de construction d'une première section d'une zone de route publique, à construire une plate-forme de construction d'une seconde section de la zone de route publique et à construire une plate-forme de construction d'une section standard. La plate-forme en porte-à-faux est utilisée pour implanter la construction de banches en acier d'une première colonne de fondations de pieu dans la zone de plate-forme et dans la zone de route publique ; la plate-forme de construction de la section de raccordement à une rive de la zone de plate-forme correspond aux première à troisième colonnes de fondations de pieu de la zone de plate-forme, la plate-forme de construction de la première section de la zone de route publique correspond aux premier à neuvième pieux coulés sur place des trois colonnes de fondations de pieu de la zone de route publique et la plate-forme de construction de la seconde section de la zone de route publique correspond au dixième à vingtième pieux coulés sur place des trois colonnes de fondations de pieu de la zone de route publique ; et la plate-forme de construction de la section standard correspond à la quatrième colonne de fondations de pieu dans la zone de plate-forme à la dix-neuvième colonne de fondations de pieu dans une zone de quai. Selon la présente invention, la sécurité et la stabilité des quais et des revêtements existants peuvent être protégées.
本发明公开了一种高桩码头灌注桩施工用平台的搭设方法,包括以下流程:悬挑平台搭设、施打位于非护岸抛石基床上的钢护筒、平台区接岸段施工平台搭设、公共道路区第一分段施工平台搭设、公共道路区第二分段施工平台搭设、标准段施工平台搭设。悬挑平台用于平台区和公共道路区的第1列桩基的钢护筒的植入施工;平台区接岸段施工平台与平台区的第1列至第3列桩基对应,公共道路区第一分段施工平台与公共道路区的3列桩基的第1根至第9根灌注桩对应,公共道路区第二分段施工平台与公共道路区的3列桩基的第10根至第20根灌注桩对应;标准段施工平台与平台区的第4列桩基至码头区的第19列桩基对应。本发明能保护既有码头和护岸的安全稳定。
METHOD FOR BUILDING PLATFORM FOR CONSTRUCTION OF CAST-IN-PLACE PILES OF HIGH-PILED WHARF
PROCÉDÉ PERMETTANT DE CONSTRUIRE UNE PLATE-FORME POUR LA CONSTRUCTION DE PIEUX COULÉS SUR PLACE D'UN QUAI À EMPILEMENT ÉLEVÉ
一种高桩码头灌注桩施工用平台的搭设方法
FAN JIANXIANG (author) / FU ZHILIN (author) / FU JIANXING (author) / WU XIONGCHENG (author) / CHEN SHAOMEI (author) / LI YOUCHUN (author) / LIN ZHIJIE (author)
2023-05-04
Patent
Electronic Resource
Chinese
Cross beam cast-in-place construction technology for long-piled wharf construction
European Patent Office | 2024
|Integrated construction platform and method for long-piled wharf
European Patent Office | 2023
|Operation platform for wharf cast-in-place beam construction
European Patent Office | 2023
|Desilting device below long-piled wharf and construction method
European Patent Office | 2024
|