ENGINEERING METHOD FOR SETTLEMENT REINFORCEMENT AND LIFTING OF RESIDENTIAL BUILDING FOUNDATION
Disclosed in the present invention is an engineering method for settlement reinforcement and lifting of a residential building foundation, comprising stratum structure exploration, curtain reinforcement, shallow layer reinforcement, deep layer reinforcement, intermediate layer stable lifting, and composite foundation reinforcement of a supporting body. The present invention has the following beneficial effects: an advancing-type layered reinforcement process is used for the shallow layer reinforcement, so that the foundation is stabilized and a settlement rate is reduced. The shallow layer reinforcement is aimed at functioning as a buffer zone during a lifting operation, and the lifting stress is more uniform; after the lifting height of a building reaches a requirement, grout supplementation and reinforcement are performed on the foundation below the full-plane foundation bottom plate of the building to form an integral raft-shaped composite foundation reinforcing body, so that a building foundation satisfies a settlement stabilization requirement and realizes a deviation correction purpose; and composite foundation supporting bodies similar to pile foundations are applied at the four corners of the building and below indoor main bearing walls, and a structural body for supporting an upper load is formed by means of repeated retreating and advancing grouting. After the reinforcement of the building foundation is completed, the building foundation realizes the settlement stabilization requirement and realizes the deviation correction purpose.
La présente invention divulgue un procédé d'ingénierie pour le renforcement du tassement et le levage d'une fondation de bâtiment résidentiel, comprenant l'exploration de structure de strate, le renforcement de rideau, le renforcement de couche peu profonde, le renforcement de couche profonde, le levage stable de couche intermédiaire et le renforcement de fondation composite d'un corps de support. La présente invention présente les effets bénéfiques suivants : un procédé de renforcement en couches de type à avance est utilisé pour le renforcement de couche peu profonde, de telle sorte que la fondation est stabilisée et un taux de tassement est réduit. Le renforcement de couche peu profonde vise à fonctionner en tant que zone tampon pendant une opération de levage, et la contrainte de levage est plus uniforme ; après que la hauteur de levage d'un bâtiment a atteint une exigence, une supplémentation en coulis et un renforcement sont effectués sur la fondation au-dessous de la plaque inférieure de fondation en plan complet du bâtiment pour former un corps de renforcement de fondation composite en forme de radier intégré, de telle sorte qu'une fondation de bâtiment satisfait une exigence de stabilisation de tassement et réalise un objectif de correction d'écart ; et des corps de support de fondation composites similaires à des fondations de pieu sont appliqués aux quatre coins du bâtiment et au-dessous des murs porteurs principaux intérieurs, et un corps structural pour supporter une charge supérieure est formé au moyen d'une injection répétée de coulis de retrait et de coulis d'avancement. Après que le renforcement de la fondation de bâtiment est achevé, la fondation de bâtiment réalise l'exigence de stabilisation de tassement et réalise l'objectif de correction d'écart.
本发明公开了一种住宅楼基础沉降加固抬升的工程方法,包括地层结构勘探、帷幕加固、浅层加固补强、深层加固、中间层稳定抬升和复合地基加固支撑体。本发明的有益效果是:浅层加固补强采用前进式分层加固工艺,稳固地基减小沉降速率。浅层加固补强的目的是在抬升作业时起到缓冲带的作用,抬升受力更均匀;建筑抬升高度达到要求后,对建筑全平面基础底板以下地基进行补浆加固,形成整体的筏型复合地基加强体,从而使建筑基础达到沉降稳定要求和纠偏的目的;在建筑四角和室内主要承重墙的下方施作类似桩基的复合地基支撑体,通过反复的后退和前进注浆形成支撑上部荷载的结构体。建筑地基加固完成后,使建筑基础达到沉降稳定要求和纠偏的目的。
ENGINEERING METHOD FOR SETTLEMENT REINFORCEMENT AND LIFTING OF RESIDENTIAL BUILDING FOUNDATION
Disclosed in the present invention is an engineering method for settlement reinforcement and lifting of a residential building foundation, comprising stratum structure exploration, curtain reinforcement, shallow layer reinforcement, deep layer reinforcement, intermediate layer stable lifting, and composite foundation reinforcement of a supporting body. The present invention has the following beneficial effects: an advancing-type layered reinforcement process is used for the shallow layer reinforcement, so that the foundation is stabilized and a settlement rate is reduced. The shallow layer reinforcement is aimed at functioning as a buffer zone during a lifting operation, and the lifting stress is more uniform; after the lifting height of a building reaches a requirement, grout supplementation and reinforcement are performed on the foundation below the full-plane foundation bottom plate of the building to form an integral raft-shaped composite foundation reinforcing body, so that a building foundation satisfies a settlement stabilization requirement and realizes a deviation correction purpose; and composite foundation supporting bodies similar to pile foundations are applied at the four corners of the building and below indoor main bearing walls, and a structural body for supporting an upper load is formed by means of repeated retreating and advancing grouting. After the reinforcement of the building foundation is completed, the building foundation realizes the settlement stabilization requirement and realizes the deviation correction purpose.
La présente invention divulgue un procédé d'ingénierie pour le renforcement du tassement et le levage d'une fondation de bâtiment résidentiel, comprenant l'exploration de structure de strate, le renforcement de rideau, le renforcement de couche peu profonde, le renforcement de couche profonde, le levage stable de couche intermédiaire et le renforcement de fondation composite d'un corps de support. La présente invention présente les effets bénéfiques suivants : un procédé de renforcement en couches de type à avance est utilisé pour le renforcement de couche peu profonde, de telle sorte que la fondation est stabilisée et un taux de tassement est réduit. Le renforcement de couche peu profonde vise à fonctionner en tant que zone tampon pendant une opération de levage, et la contrainte de levage est plus uniforme ; après que la hauteur de levage d'un bâtiment a atteint une exigence, une supplémentation en coulis et un renforcement sont effectués sur la fondation au-dessous de la plaque inférieure de fondation en plan complet du bâtiment pour former un corps de renforcement de fondation composite en forme de radier intégré, de telle sorte qu'une fondation de bâtiment satisfait une exigence de stabilisation de tassement et réalise un objectif de correction d'écart ; et des corps de support de fondation composites similaires à des fondations de pieu sont appliqués aux quatre coins du bâtiment et au-dessous des murs porteurs principaux intérieurs, et un corps structural pour supporter une charge supérieure est formé au moyen d'une injection répétée de coulis de retrait et de coulis d'avancement. Après que le renforcement de la fondation de bâtiment est achevé, la fondation de bâtiment réalise l'exigence de stabilisation de tassement et réalise l'objectif de correction d'écart.
本发明公开了一种住宅楼基础沉降加固抬升的工程方法,包括地层结构勘探、帷幕加固、浅层加固补强、深层加固、中间层稳定抬升和复合地基加固支撑体。本发明的有益效果是:浅层加固补强采用前进式分层加固工艺,稳固地基减小沉降速率。浅层加固补强的目的是在抬升作业时起到缓冲带的作用,抬升受力更均匀;建筑抬升高度达到要求后,对建筑全平面基础底板以下地基进行补浆加固,形成整体的筏型复合地基加强体,从而使建筑基础达到沉降稳定要求和纠偏的目的;在建筑四角和室内主要承重墙的下方施作类似桩基的复合地基支撑体,通过反复的后退和前进注浆形成支撑上部荷载的结构体。建筑地基加固完成后,使建筑基础达到沉降稳定要求和纠偏的目的。
ENGINEERING METHOD FOR SETTLEMENT REINFORCEMENT AND LIFTING OF RESIDENTIAL BUILDING FOUNDATION
PROCÉDÉ D'INGÉNIERIE POUR LE RENFORCEMENT DU TASSEMENT ET LE LEVAGE D'UNE FONDATION DE BÂTIMENT RÉSIDENTIEL
一种住宅楼基础沉降加固抬升的工程方法
CUI TENGYUE (author)
2023-08-24
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Engineering method for settlement reinforcement and lifting of residential building foundation
European Patent Office | 2024
Engineering method for settlement reinforcement and lifting of residential building foundation
European Patent Office | 2024
|Engineering method for settlement reinforcement and lifting of residential building foundation
European Patent Office | 2022
|ENGINEERING METHOD FOR REINFORCING AND LIFTING A SUNKEN FOUNDATION OF A RESIDENTIAL BUILDING
European Patent Office | 2024
|Construction method for high-rise building settlement reinforcement lifting deviation rectification
European Patent Office | 2021
|