A platform for research: civil engineering, architecture and urbanism
ADJUSTABLE LONGITUDINAL BEAM SELF-HANGING BASKET TRUCK AND CONSTRUCTION METHOD USING SAME
The present application relates to an adjustable longitudinal beam self-hanging basket truck and a construction method using same. The adjustable longitudinal beam self-hanging basket truck comprises a crawler transporter, an adjustable longitudinal beam mechanism, a balance force-bearing structure, a pedestal mechanism and a suspension hanging basket formwork system, wherein the adjustable longitudinal beam mechanism and the balance force-bearing structure are located on the crawler transporter; the pedestal mechanism is located on a front end edge of a shaped box girder bridge deck; and the suspension hanging basket formwork system is located on longitudinal beams at a front end of the pedestal mechanism. By means of the present application, the weight of a hanging basket is reduced by 60% of the weight of a traditional hanging basket, and there is no need for on-site construction; and multiple trucks can be used and arranged side-by-side for construction, such that the construction of box girder to be cast for one construction section can be completed in one go, as compared with the construction of box girder to be cast using a traditional hanging basket that needs to be assembled in half to complete one construction section, thereby greatly improving the pouring quality of the box girder to be cast.
La présente invention concerne un chariot de panier auto-suspendu à poutre longitudinale réglable et un procédé de construction l'utilisant. Le chariot de panier auto-suspendu à poutre longitudinale réglable comprend un véhicule transporteur sur chenilles, un mécanisme de poutre longitudinale réglable, une structure de support de force d'équilibrage, un mécanisme de socle et un système de coffrage de panier suspendu de suspension, le mécanisme de poutre longitudinale réglable et la structure de support de force d'équilibrage étant situés sur le véhicule transporteur sur chenilles ; le mécanisme de socle est situé sur un bord d'extrémité avant d'un tablier à poutre-caisson façonné ; et le système de coffrage de panier suspendu de suspension est situé sur des poutres longitudinales au niveau d'une extrémité avant du mécanisme de socle. Au moyen de la présente invention, le poids d'un panier suspendu est réduit de 60% par rapport au poids d'un panier suspendu classique, et il n'est pas nécessaire de construction sur site ; et de multiples camions peuvent être utilisés et agencés côte à côte pour la construction, de telle sorte que la construction de poutre-caisson à couler pour une section de construction peut être achevée en une fois, par comparaison avec la construction de poutre-caisson à couler à l'aide d'un panier suspendu classique qui doit être assemblé en deux pour achever une section de construction, ce qui permet d'améliorer considérablement la qualité de coulage de la poutre-caisson à couler.
本申请属于一种可调纵梁式自行挂篮车及其施工方法,包括履带式运输车、可调纵梁机构、平衡分力结构、支座机构和悬空挂篮模板体系,可调纵梁机构和平衡分力结构位于履带式运输车上,支座机构位于成形箱梁桥面前端沿上,悬空挂篮模板体系位于支座机构前端的纵梁上。本申请减轻了传统挂篮自身的重量60%,且无需现场搭建,本申请可多台并排施工,不存在传统的挂篮需半幅拼装完成一施工段的待浇箱梁施工,可一次完成一施工段的待浇箱梁的施工,大幅度提高了待浇箱梁的浇筑质量。
ADJUSTABLE LONGITUDINAL BEAM SELF-HANGING BASKET TRUCK AND CONSTRUCTION METHOD USING SAME
The present application relates to an adjustable longitudinal beam self-hanging basket truck and a construction method using same. The adjustable longitudinal beam self-hanging basket truck comprises a crawler transporter, an adjustable longitudinal beam mechanism, a balance force-bearing structure, a pedestal mechanism and a suspension hanging basket formwork system, wherein the adjustable longitudinal beam mechanism and the balance force-bearing structure are located on the crawler transporter; the pedestal mechanism is located on a front end edge of a shaped box girder bridge deck; and the suspension hanging basket formwork system is located on longitudinal beams at a front end of the pedestal mechanism. By means of the present application, the weight of a hanging basket is reduced by 60% of the weight of a traditional hanging basket, and there is no need for on-site construction; and multiple trucks can be used and arranged side-by-side for construction, such that the construction of box girder to be cast for one construction section can be completed in one go, as compared with the construction of box girder to be cast using a traditional hanging basket that needs to be assembled in half to complete one construction section, thereby greatly improving the pouring quality of the box girder to be cast.
La présente invention concerne un chariot de panier auto-suspendu à poutre longitudinale réglable et un procédé de construction l'utilisant. Le chariot de panier auto-suspendu à poutre longitudinale réglable comprend un véhicule transporteur sur chenilles, un mécanisme de poutre longitudinale réglable, une structure de support de force d'équilibrage, un mécanisme de socle et un système de coffrage de panier suspendu de suspension, le mécanisme de poutre longitudinale réglable et la structure de support de force d'équilibrage étant situés sur le véhicule transporteur sur chenilles ; le mécanisme de socle est situé sur un bord d'extrémité avant d'un tablier à poutre-caisson façonné ; et le système de coffrage de panier suspendu de suspension est situé sur des poutres longitudinales au niveau d'une extrémité avant du mécanisme de socle. Au moyen de la présente invention, le poids d'un panier suspendu est réduit de 60% par rapport au poids d'un panier suspendu classique, et il n'est pas nécessaire de construction sur site ; et de multiples camions peuvent être utilisés et agencés côte à côte pour la construction, de telle sorte que la construction de poutre-caisson à couler pour une section de construction peut être achevée en une fois, par comparaison avec la construction de poutre-caisson à couler à l'aide d'un panier suspendu classique qui doit être assemblé en deux pour achever une section de construction, ce qui permet d'améliorer considérablement la qualité de coulage de la poutre-caisson à couler.
本申请属于一种可调纵梁式自行挂篮车及其施工方法,包括履带式运输车、可调纵梁机构、平衡分力结构、支座机构和悬空挂篮模板体系,可调纵梁机构和平衡分力结构位于履带式运输车上,支座机构位于成形箱梁桥面前端沿上,悬空挂篮模板体系位于支座机构前端的纵梁上。本申请减轻了传统挂篮自身的重量60%,且无需现场搭建,本申请可多台并排施工,不存在传统的挂篮需半幅拼装完成一施工段的待浇箱梁施工,可一次完成一施工段的待浇箱梁的施工,大幅度提高了待浇箱梁的浇筑质量。
ADJUSTABLE LONGITUDINAL BEAM SELF-HANGING BASKET TRUCK AND CONSTRUCTION METHOD USING SAME
CHARIOT DE PANIER AUTO-SUSPENDU À POUTRE LONGITUDINALE RÉGLABLE ET PROCÉDÉ DE CONSTRUCTION L'UTILISANT
可调纵梁式自行挂篮车及其施工方法
WANG JINGHUA (author) / ZHANG CHENGWU (author) / ZHANG DONGSHAN (author) / CHEN LI (author) / GENG JIAQI (author) / LIU YUXIN (author) / FAN JINGXUAN (author) / YU LIAN (author) / LI MINGHUAN (author) / WU KETENG (author)
2024-06-27
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2023
|Adjustable hanging basket used for steel beam and construction method thereof
European Patent Office | 2020
|Hanging basket assembly and hanging basket construction method
European Patent Office | 2022
|Construction hanging basket structure and hanging basket moving method
European Patent Office | 2024
|