A platform for research: civil engineering, architecture and urbanism
MAIN-GIRDER CONTINUOUS RIGID-JOINT CONSTRUCTION METHOD
Provided is a construction method that enables both friction joining between the ends of left-span main girders and right-span main girders, and connecting plates, and relieving of negative moment originating in dead load on the main girders, and that also enables rigid joining between the main girders and piers. In this main-girder continuous rigid-joint construction method, before the bridge-body concrete is poured, connecting plates are temporarily tacked on to simple-support a left-span main girder and a right-span main girder, and meanwhile, after displacing of the girder ends of each main girder slightly upward due to the pouring of the bridge-body concrete is suitably absorbed, the connecting plates are permanently fixed to connect the left-span main girder and the right-span main girder, and the main girders each are connected to a pier by means of a linking bar. The foregoing thus makes it possible to make both main girders firmly continuous while preventing the occurrence of negative bending moment, and furthermore, to rigidly join these continuous main girders to the pier.
L'invention concerne un procédé de construction qui permet à la fois un assemblage par frottement entre les extrémités de poutres principales de portée gauche et de poutres principales de portée droite, et des plaques de liaison, et la dissipation d'un moment négatif provenant d'une charge morte sur les poutres principales, et qui permet également un assemblage rigide entre les poutres principales et des piles. Dans ce procédé de construction d'assemblage rigide continu de poutre principale, avant que le béton de corps de pont soit versé, des plaques de liaison sont temporairement clouées pour supporter de manière simple une poutre principale de portée gauche et une poutre principale de portée droite, et pendant ce temps, après le déplacement des extrémités de poutre de chaque poutre principale légèrement vers le haut en raison de la coulée du béton de corps de pont est absorbée de manière appropriée, les plaques de liaison sont fixées de manière permanente pour relier la poutre principale de portée gauche et la poutre principale de portée droite, et les poutres principales sont chacune reliées à une pile au moyen d'une barre de liaison. Ce qui précède permet ainsi de rendre les deux poutres principales fermement continues tout en empêchant l'apparition d'un moment de flexion négatif, et en outre, d'assembler de manière rigide ces poutres principales continues aux piles.
左径間主桁及び右径間主桁の各桁端と連結板との摩擦接合と、各主桁の死荷重に基づく負のモーメントの減殺とを両立することができると共に、各主桁と橋脚とを剛結合することができる工法の提供。 本発明に係る主桁連続化剛結合工法は、橋体コンクリート打設前は、連結板を仮止めして左径間主桁及び右径間主桁を単純支持する一方、橋体コンクリート打設によって各主桁の桁端が僅かに上方に変位するのを適切に吸収した後に、連結板を本止めして左径間主桁及び右径間主桁を連結し、連結条材によって各主桁と橋脚とを連結するので、負の曲げモーメントの発生を防止しつつ強固に両主桁を連続化することができると共に、さらには該連続化した両主桁を橋脚と剛結合することができる。
MAIN-GIRDER CONTINUOUS RIGID-JOINT CONSTRUCTION METHOD
Provided is a construction method that enables both friction joining between the ends of left-span main girders and right-span main girders, and connecting plates, and relieving of negative moment originating in dead load on the main girders, and that also enables rigid joining between the main girders and piers. In this main-girder continuous rigid-joint construction method, before the bridge-body concrete is poured, connecting plates are temporarily tacked on to simple-support a left-span main girder and a right-span main girder, and meanwhile, after displacing of the girder ends of each main girder slightly upward due to the pouring of the bridge-body concrete is suitably absorbed, the connecting plates are permanently fixed to connect the left-span main girder and the right-span main girder, and the main girders each are connected to a pier by means of a linking bar. The foregoing thus makes it possible to make both main girders firmly continuous while preventing the occurrence of negative bending moment, and furthermore, to rigidly join these continuous main girders to the pier.
L'invention concerne un procédé de construction qui permet à la fois un assemblage par frottement entre les extrémités de poutres principales de portée gauche et de poutres principales de portée droite, et des plaques de liaison, et la dissipation d'un moment négatif provenant d'une charge morte sur les poutres principales, et qui permet également un assemblage rigide entre les poutres principales et des piles. Dans ce procédé de construction d'assemblage rigide continu de poutre principale, avant que le béton de corps de pont soit versé, des plaques de liaison sont temporairement clouées pour supporter de manière simple une poutre principale de portée gauche et une poutre principale de portée droite, et pendant ce temps, après le déplacement des extrémités de poutre de chaque poutre principale légèrement vers le haut en raison de la coulée du béton de corps de pont est absorbée de manière appropriée, les plaques de liaison sont fixées de manière permanente pour relier la poutre principale de portée gauche et la poutre principale de portée droite, et les poutres principales sont chacune reliées à une pile au moyen d'une barre de liaison. Ce qui précède permet ainsi de rendre les deux poutres principales fermement continues tout en empêchant l'apparition d'un moment de flexion négatif, et en outre, d'assembler de manière rigide ces poutres principales continues aux piles.
左径間主桁及び右径間主桁の各桁端と連結板との摩擦接合と、各主桁の死荷重に基づく負のモーメントの減殺とを両立することができると共に、各主桁と橋脚とを剛結合することができる工法の提供。 本発明に係る主桁連続化剛結合工法は、橋体コンクリート打設前は、連結板を仮止めして左径間主桁及び右径間主桁を単純支持する一方、橋体コンクリート打設によって各主桁の桁端が僅かに上方に変位するのを適切に吸収した後に、連結板を本止めして左径間主桁及び右径間主桁を連結し、連結条材によって各主桁と橋脚とを連結するので、負の曲げモーメントの発生を防止しつつ強固に両主桁を連続化することができると共に、さらには該連続化した両主桁を橋脚と剛結合することができる。
MAIN-GIRDER CONTINUOUS RIGID-JOINT CONSTRUCTION METHOD
PROCÉDÉ DE CONSTRUCTION D'ASSEMBLAGE RIGIDE CONTINU DE POUTRE PRINCIPALE
主桁連続化剛結合工法
TOKUNO MITSUHIRO (author)
2024-07-25
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
Rigid frame bridge girder joint jacking force applying device and construction method
European Patent Office | 2021
|MAIN GIRDER FOR BRIDGE, BRIDGE HAVING SAME MAIN GIRDER, AND BRIDGE CONSTRUCTION METHOD
European Patent Office | 2018
|Construction method combining rotation and pushing of continuous rigid frame bridge girder
European Patent Office | 2023
|