A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR VIBRO-REPLACEMENT STONE COLUMN IN RIPRAP LAYER WITH UNDERLYING SILT
A construction method for a vibro-replacement stone column in a riprap layer with underlying silt. A feeding system of a construction apparatus is composed of a lifting bucket, an aggregate bin, a double-locked pressure chamber, a vibroflotation guide rod and feeding pipe, and a discharge outlet, wherein a weighing device is provided on the lifting bucket to ensure accurate feeding metering; high-pressure water and air pipes and high-pressure water and air nozzles, which are arranged outside the vibroflotation guide rod and feeding pipe, jet high-pressure water and air during unloading so as to form a cavity inside a silt layer or a riprap body, thereby ensuring smooth discharging; in addition, when stone in the riprap body gets stuck in the discharge outlet, the stone is pushed to move with the assistance of high-pressure water and air. A construction apparatus body is composed of the vibroflotation guide rod and feeding pipe, a vibration damper, a high-power vibroflot and bottom-opening water-air nozzles. A hole is drilled vertically, and a retaining wall system is formed; and a vibroflotation apparatus is lifted to a certain height, discharging is then started, the vibroflotation apparatus is lowered after filling, and this process is repeated until a column is formed. No pilot-hole pre-drilling operation is required, the apparatus and personnel investment is reduced, and the engineering construction cost is reduced.
L'invention concerne un procédé de construction par compactage par vibroflottation de colonnes ballastées dans une couche d'enrochement ayant une sous-couche de limon. Un système d'alimentation d'un appareil de construction est composé d'un godet de levage, d'un bac d'agrégat, d'une chambre de pression à double verrouillage, d'une tige de guidage de vibroflottation et d'un tuyau d'alimentation, et d'une sortie d'évacuation, un dispositif de pesage étant disposé sur le godet de levage pour assurer un dosage d'alimentation précis ; des tuyaux d'eau et d'air à haute pression et des buses d'eau et d'air à haute pression, qui sont disposés à l'extérieur de la tige de guidage de vibroflottation et du tuyau d'alimentation, de l'eau à haute pression de jet et de l'air pendant le déchargement de façon à former une cavité à l'intérieur d'une couche de limon ou d'un corps d'enrochement, ce qui permet d'assurer une évacuation régulière ; de plus, lorsque de la pierre dans le corps d'enrochement est coincée dans la sortie d'évacuation, la pierre est poussée pour se déplacer à l'aide d'eau et d'air à haute pression. Un corps d'appareil de construction est composé de la tige de guidage de vibroflottation et du tuyau d'alimentation, d'un amortisseur de vibrations, d'une vibroflottation haute puissance et de buses eau-air à ouverture inférieure. Un trou est percé verticalement, et un système de paroi de retenue est formé ; et un appareil de vibroflottation est soulevé jusqu'à une certaine hauteur, l'évacuation est ensuite démarrée, l'appareil de vibroflottation est abaissé après le remplissage, et ce procédé est répété jusqu'à ce qu'une colonne soit formée. Aucune opération de pré-perçage de trou pilote n'est requise, l'appareil et l'investissement en personnel sont réduits, et le coût de construction d'ingénierie est réduit.
一种抛石层下卧淤泥振冲碎石桩施工方法,由提料斗、集料斗和双锁压力仓及振冲导杆兼供料管和出料口组成,提料斗上设置称重设施确保投料计量准确,振冲导杆兼供料管外设置的高压水、气管及高压水、气喷口在下料时喷射高压水、气,在淤泥层或抛石体内形成空腔,确保顺利出料;同时在抛石体内有石料卡住出料口时采用高压水气辅助推移;施工设备主体由振冲导杆兼供料管、减震器、大功率振冲器及底口水气喷口组成;垂直成孔,并形成护壁体系;上提振冲设备一定高度,开始投料,填料后降低振冲设备,如此往复直至成桩。无需前置引孔作业,减少设备、人员投入,降低工程建设成本。
CONSTRUCTION METHOD FOR VIBRO-REPLACEMENT STONE COLUMN IN RIPRAP LAYER WITH UNDERLYING SILT
A construction method for a vibro-replacement stone column in a riprap layer with underlying silt. A feeding system of a construction apparatus is composed of a lifting bucket, an aggregate bin, a double-locked pressure chamber, a vibroflotation guide rod and feeding pipe, and a discharge outlet, wherein a weighing device is provided on the lifting bucket to ensure accurate feeding metering; high-pressure water and air pipes and high-pressure water and air nozzles, which are arranged outside the vibroflotation guide rod and feeding pipe, jet high-pressure water and air during unloading so as to form a cavity inside a silt layer or a riprap body, thereby ensuring smooth discharging; in addition, when stone in the riprap body gets stuck in the discharge outlet, the stone is pushed to move with the assistance of high-pressure water and air. A construction apparatus body is composed of the vibroflotation guide rod and feeding pipe, a vibration damper, a high-power vibroflot and bottom-opening water-air nozzles. A hole is drilled vertically, and a retaining wall system is formed; and a vibroflotation apparatus is lifted to a certain height, discharging is then started, the vibroflotation apparatus is lowered after filling, and this process is repeated until a column is formed. No pilot-hole pre-drilling operation is required, the apparatus and personnel investment is reduced, and the engineering construction cost is reduced.
L'invention concerne un procédé de construction par compactage par vibroflottation de colonnes ballastées dans une couche d'enrochement ayant une sous-couche de limon. Un système d'alimentation d'un appareil de construction est composé d'un godet de levage, d'un bac d'agrégat, d'une chambre de pression à double verrouillage, d'une tige de guidage de vibroflottation et d'un tuyau d'alimentation, et d'une sortie d'évacuation, un dispositif de pesage étant disposé sur le godet de levage pour assurer un dosage d'alimentation précis ; des tuyaux d'eau et d'air à haute pression et des buses d'eau et d'air à haute pression, qui sont disposés à l'extérieur de la tige de guidage de vibroflottation et du tuyau d'alimentation, de l'eau à haute pression de jet et de l'air pendant le déchargement de façon à former une cavité à l'intérieur d'une couche de limon ou d'un corps d'enrochement, ce qui permet d'assurer une évacuation régulière ; de plus, lorsque de la pierre dans le corps d'enrochement est coincée dans la sortie d'évacuation, la pierre est poussée pour se déplacer à l'aide d'eau et d'air à haute pression. Un corps d'appareil de construction est composé de la tige de guidage de vibroflottation et du tuyau d'alimentation, d'un amortisseur de vibrations, d'une vibroflottation haute puissance et de buses eau-air à ouverture inférieure. Un trou est percé verticalement, et un système de paroi de retenue est formé ; et un appareil de vibroflottation est soulevé jusqu'à une certaine hauteur, l'évacuation est ensuite démarrée, l'appareil de vibroflottation est abaissé après le remplissage, et ce procédé est répété jusqu'à ce qu'une colonne soit formée. Aucune opération de pré-perçage de trou pilote n'est requise, l'appareil et l'investissement en personnel sont réduits, et le coût de construction d'ingénierie est réduit.
一种抛石层下卧淤泥振冲碎石桩施工方法,由提料斗、集料斗和双锁压力仓及振冲导杆兼供料管和出料口组成,提料斗上设置称重设施确保投料计量准确,振冲导杆兼供料管外设置的高压水、气管及高压水、气喷口在下料时喷射高压水、气,在淤泥层或抛石体内形成空腔,确保顺利出料;同时在抛石体内有石料卡住出料口时采用高压水气辅助推移;施工设备主体由振冲导杆兼供料管、减震器、大功率振冲器及底口水气喷口组成;垂直成孔,并形成护壁体系;上提振冲设备一定高度,开始投料,填料后降低振冲设备,如此往复直至成桩。无需前置引孔作业,减少设备、人员投入,降低工程建设成本。
CONSTRUCTION METHOD FOR VIBRO-REPLACEMENT STONE COLUMN IN RIPRAP LAYER WITH UNDERLYING SILT
PROCÉDÉ DE CONSTRUCTION PAR COMPACTAGE PAR VIBROFLOTTATION DE COLONNES BALLASTÉES DANS UNE COUCHE D'ENROCHEMENT AYANT UNE SOUS-COUCHE DE LIMON
一种抛石层下卧淤泥振冲碎石桩施工方法
WANG AIPING (author) / AO HANBING (author) / HU QINZHOU (author) / GUO ZHIPENG (author) / DONG ZHIFANG (author) / FAN WENBO (author)
2025-02-06
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for vibro-replacement gravel pile with silt below riprap layer
European Patent Office | 2023
|Vibro-replacement hole-forming construction method of vibro-replacement stone column machine
European Patent Office | 2023
|Vibro-replacement stone column and construction method thereof
European Patent Office | 2020
|Construction method of vibro-replacement stone column machine
European Patent Office | 2023
|Automatic feeding method in vibro-replacement stone column machine construction
European Patent Office | 2023
|