A platform for research: civil engineering, architecture and urbanism
A robust planning and control methodology for design-build fast-track civil engineering and architectural projects
A robust planning and control methodology for design-build fast-track civil engineering and architectural projects
A robust planning and control methodology for design-build fast-track civil engineering and architectural projects
Li, Michael In-Chiang, 1975- (author)
1999
114 pages , 9420946 byte , 9420704 byte
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1999.
Includes bibliographical references (leaves 107-108).
Theses
Electronic Resource
English
Dynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects
British Library Online Contents | 2001
|A collaborative negotiation methodology for large scale civil engineering and architectural projects
Springer Verlag | 1998
|Design and Build Concept in Large Civil Engineering Projects
British Library Conference Proceedings | 1996
|A collaborative negotiation methodology for large scale civil engineering and architectural projects
British Library Conference Proceedings | 1998
|