A platform for research: civil engineering, architecture and urbanism
Multiple-Purpose Project: Platte River Basin, Little Platte River, Missouri, Smithville Lake; Operation and Maintenance Manual. Appendix 5. Embankment Criteria and Performance Report
Contents: Site Geology; Design Measures; Foundation Treatment; Embankment/Spillway; Slope Protection; Diversion and Closure; Instrumentation; Construction Notes; Operational Notes.
Multiple-Purpose Project: Platte River Basin, Little Platte River, Missouri, Smithville Lake; Operation and Maintenance Manual. Appendix 5. Embankment Criteria and Performance Report
Contents: Site Geology; Design Measures; Foundation Treatment; Embankment/Spillway; Slope Protection; Diversion and Closure; Instrumentation; Construction Notes; Operational Notes.
Multiple-Purpose Project: Platte River Basin, Little Platte River, Missouri, Smithville Lake; Operation and Maintenance Manual. Appendix 5. Embankment Criteria and Performance Report
F. C. Walberg (author) / J. D. Holm (author) / M. S. George (author)
1984
342 pages
Report
No indication
English