A platform for research: civil engineering, architecture and urbanism
Multiple-Purpose Project: Platte River Basin, Little Platte River, Missouri, Smithville Lake; Operation and Maintenance Manual. Appendix 5. Embankment Criteria and Performance Report. Supplement 1
The purpose of this supplement is to present the general plan used to improve the stability of the dam at high pool levels, which includes (1) investigations performed, (2) results tabulated, (3) remedial measures installed and (4) performance to date. Contents: Geology; Seepage Control; Stability Analysis.
Multiple-Purpose Project: Platte River Basin, Little Platte River, Missouri, Smithville Lake; Operation and Maintenance Manual. Appendix 5. Embankment Criteria and Performance Report. Supplement 1
The purpose of this supplement is to present the general plan used to improve the stability of the dam at high pool levels, which includes (1) investigations performed, (2) results tabulated, (3) remedial measures installed and (4) performance to date. Contents: Geology; Seepage Control; Stability Analysis.
Multiple-Purpose Project: Platte River Basin, Little Platte River, Missouri, Smithville Lake; Operation and Maintenance Manual. Appendix 5. Embankment Criteria and Performance Report. Supplement 1
F. C. Walberg (author) / J. D. Holm (author) / M. S. George (author)
1987
202 pages
Report
No indication
English
Civil Engineering , Geology & Geophysics , Embankments , Earth dams , Geology , Missouri , Stability , Planning , Multipurpose , Control , Seepage , Dams , Engineering geology , Smithville Lake