A platform for research: civil engineering, architecture and urbanism
Evaluation of Corrosion Inhibitors for Concrete Bridge Deck Patches and Overlays
This report presents the results to date of a national pooled fund study initiated in August 1996 to evaluate the long-term performance of bridges and outdoor exposure slabs damaged by chloride-induced corrosion that have concrete containing corrosion inhibiting admixtures and that had topical applications of inhibitors prior to being patched and overlaid. The study includes 156 exposure slabs, 4 bridge decks with overlays, and 1 patched bridge substructure. A total of 136 exposure slabs were constructed to simulate overlay and patch repairs, and 20 full-depth slabs were constructed to simulate new construction. Each repaired slab was constructed with one of four levels of chloride to cause corrosion. The new slabs were ponded to cause corrosion. Previous reports provide details on the construction and initial condition of the exposure slabs and the construction and initial condition of the repaired bridges. The results presented here are based on quarterly nondestructive measurements between September 1997 and June 2001, visual inspections of the exposure slabs, and tensile bond test results and visual inspections of reinforcement removed from the exposure slabs that were patched and overlaid.
Evaluation of Corrosion Inhibitors for Concrete Bridge Deck Patches and Overlays
This report presents the results to date of a national pooled fund study initiated in August 1996 to evaluate the long-term performance of bridges and outdoor exposure slabs damaged by chloride-induced corrosion that have concrete containing corrosion inhibiting admixtures and that had topical applications of inhibitors prior to being patched and overlaid. The study includes 156 exposure slabs, 4 bridge decks with overlays, and 1 patched bridge substructure. A total of 136 exposure slabs were constructed to simulate overlay and patch repairs, and 20 full-depth slabs were constructed to simulate new construction. Each repaired slab was constructed with one of four levels of chloride to cause corrosion. The new slabs were ponded to cause corrosion. Previous reports provide details on the construction and initial condition of the exposure slabs and the construction and initial condition of the repaired bridges. The results presented here are based on quarterly nondestructive measurements between September 1997 and June 2001, visual inspections of the exposure slabs, and tensile bond test results and visual inspections of reinforcement removed from the exposure slabs that were patched and overlaid.
Evaluation of Corrosion Inhibitors for Concrete Bridge Deck Patches and Overlays
M. M. Sprinkel (author)
2003
46 pages
Report
No indication
English
Polymer-Concrete Bridge Deck Overlays
British Library Online Contents | 1994
|Rapid Concrete Bridge Deck Overlays
British Library Conference Proceedings | 2011
|Concrete Bridge Deck Overlays Evaluated by NDT
British Library Conference Proceedings | 2004
|Concrete bridge deck overlays evaluated by NDT
Tema Archive | 2004
|