A platform for research: civil engineering, architecture and urbanism
Evaluation of Pore Pressures Beneath an Embankment
Excess pore pressures measured during construction of a highway embankment on a deep deposit of soft to medium clay are evaluated. Several methods for predicting initial excess pore pressures are examined, including a recently developed method that considers the effects of local yield within the foundation soil. Undrained shear strengths backfigured from the field pore pressure data are compared to strengths measured in laboratory shear tests and field vane tests. Methods for using piezometer data to estimate embankment stability during construction are discussed. (Author)
Evaluation of Pore Pressures Beneath an Embankment
Excess pore pressures measured during construction of a highway embankment on a deep deposit of soft to medium clay are evaluated. Several methods for predicting initial excess pore pressures are examined, including a recently developed method that considers the effects of local yield within the foundation soil. Undrained shear strengths backfigured from the field pore pressure data are compared to strengths measured in laboratory shear tests and field vane tests. Methods for using piezometer data to estimate embankment stability during construction are discussed. (Author)
Evaluation of Pore Pressures Beneath an Embankment
D. J. D'Appolonia (author) / T. W. Lambe (author) / H. G. Poulos (author)
1971
40 pages
Report
No indication
English
Prediction of settlements and pore pressures beneath highway embankment at New Liskeard, Ontario
Engineering Index Backfile | 1965
|Embankment pore pressures during construction
Engineering Index Backfile | 1966
|Embankment pore pressures during construction
Engineering Index Backfile | 1968
|Embankment Pore Pressures during Construction
NTIS | 1966
|