A platform for research: civil engineering, architecture and urbanism
Demonstration of a Retrofit Solar Heating System on the Jemez Pueblo Civic Center. Final Report, February 25, 1980-January 31, 1983
This project consisted of designing and constructing thermal envelope improvements, a retrofit Trombe wall, and a domestic hot water preheater on the Jemez pueblo Civic Center, an 11,000-square foot masonry building which houses a gymnasium, classrooms, and the tribal offices. The purpose of this project was to demonstrate the applicability of retrofit solar heating systems to large buildings owned by local governments in remote areas of the state. preliminary estimates indicated that the proposed retrofit installation would reduce the fuel consumption of the subject building substantially. After construction, the fuel consumption of the building was monitored to measure the actual fuel and cost savings, which are projected to be nearly 50%. (ERA citation 09:004544)
Demonstration of a Retrofit Solar Heating System on the Jemez Pueblo Civic Center. Final Report, February 25, 1980-January 31, 1983
This project consisted of designing and constructing thermal envelope improvements, a retrofit Trombe wall, and a domestic hot water preheater on the Jemez pueblo Civic Center, an 11,000-square foot masonry building which houses a gymnasium, classrooms, and the tribal offices. The purpose of this project was to demonstrate the applicability of retrofit solar heating systems to large buildings owned by local governments in remote areas of the state. preliminary estimates indicated that the proposed retrofit installation would reduce the fuel consumption of the subject building substantially. After construction, the fuel consumption of the building was monitored to measure the actual fuel and cost savings, which are projected to be nearly 50%. (ERA citation 09:004544)
Demonstration of a Retrofit Solar Heating System on the Jemez Pueblo Civic Center. Final Report, February 25, 1980-January 31, 1983
W. R. Edgel (author)
1983
53 pages
Report
No indication
English
British Library Online Contents | 1999
|Trombe Wall Retrofit. Final Performance Report
NTIS | 1979
|Warner Hall Energy Retrofit. Final Report
NTIS | 1982