A platform for research: civil engineering, architecture and urbanism
Final Environmental Assessment: For Construction of an Addition to the Joint Strike Fighter Reprogramming Facility, Building 614, on Eglin Air Force Base, Florida
The Air Force proposes to renovate and build an addition to Building 614 in support of the Joint Strike Fighter (JSF) Reprogramming Facility (JRF) at Eglin Air Force Base (AFB), Florida (Figure 1-1). The proposed project would include the construction of a 6,700 square-foot building addition, a parking lot, interior renovations, existing pavement demolition, force protection standoff measures, new chillers, a transformer, a back-up generator, and associated infrastructure. The proposed project would provide a lab, control room, conference room, and supporting spaces for the JSF Stimulation System Integration System (StimSIS) equipment necessary to test mission data. Building construction and renovation activities would meet Special Access Program Facility (SAPF) criteria for processing and storing classified information and provide radio frequency (RF) shielding for operational purposes.
Final Environmental Assessment: For Construction of an Addition to the Joint Strike Fighter Reprogramming Facility, Building 614, on Eglin Air Force Base, Florida
The Air Force proposes to renovate and build an addition to Building 614 in support of the Joint Strike Fighter (JSF) Reprogramming Facility (JRF) at Eglin Air Force Base (AFB), Florida (Figure 1-1). The proposed project would include the construction of a 6,700 square-foot building addition, a parking lot, interior renovations, existing pavement demolition, force protection standoff measures, new chillers, a transformer, a back-up generator, and associated infrastructure. The proposed project would provide a lab, control room, conference room, and supporting spaces for the JSF Stimulation System Integration System (StimSIS) equipment necessary to test mission data. Building construction and renovation activities would meet Special Access Program Facility (SAPF) criteria for processing and storing classified information and provide radio frequency (RF) shielding for operational purposes.
Final Environmental Assessment: For Construction of an Addition to the Joint Strike Fighter Reprogramming Facility, Building 614, on Eglin Air Force Base, Florida
S. Baker-Littman (author) / A. Baumann (author) / B. Boykin (author) / J. Koralewski (author) / B. Penrose (author)
2007
115 pages
Report
No indication
English
Air Pollution & Control , Solid Wastes Pollution & Control , Water Pollution & Control , Environmental Health & Safety , Air force facilities , Environmental assessment , Air force , Air quality , Backup systems , Buildings , Construction , Control centers , Demolition , Erosion , Generators , Hazardous materials , Integrated systems , Jet fighters , Laboratories , Pavements , Processing , Radiofrequency , Shielding , Stimulation(General) , Symposia , Water resources , Eglin air force base