A platform for research: civil engineering, architecture and urbanism
Lower Main Canal Hydro Stations. Feasibility Assessment Report
A feasibility assessment of small hydroelectric powerplants on the MID Lower Main Canal at Modesto Reservoir and Stone Drop is presented. Included are results of analyses covering alternative layouts for civil works and alternative turbine-generator units. The analyses were conducted at a feasibility level as were quantity takeoffs and construction cost estimates. This evaluation indicates that it is technically feasible to construct powerplants at the Modesto Reservoir and Stone Drop sites. (ERA citation 04:042523)
Lower Main Canal Hydro Stations. Feasibility Assessment Report
A feasibility assessment of small hydroelectric powerplants on the MID Lower Main Canal at Modesto Reservoir and Stone Drop is presented. Included are results of analyses covering alternative layouts for civil works and alternative turbine-generator units. The analyses were conducted at a feasibility level as were quantity takeoffs and construction cost estimates. This evaluation indicates that it is technically feasible to construct powerplants at the Modesto Reservoir and Stone Drop sites. (ERA citation 04:042523)
Lower Main Canal Hydro Stations. Feasibility Assessment Report
1978
90 pages
Report
No indication
English
FEASIBILITY ANALYSIS OF CANAL TOP SOLAR-HYDRO PLANT BASED HYBRID GENERATION
BASE | 2021
|Engineering Index Backfile | 1930
Reduction of peak dynamic loads on pumping units of main canal stations
Springer Verlag | 1985
|Operation of the Cascade of Pumping Stations of the Karshi Main Canal
Springer Verlag | 2021
|