A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. Bigney Pond Dam (MA 00422), Massachusetts-Rhode Island Coastal Basin, Brockton, Massachusetts. Phase I, Inspection Report
Bigney Pond Dam is formed by an approximately 180 ft. length of earth embankment confined by vertical atone masonry retaining walls about 11 ft. high. The dam is in good condition. It has a low hazard potential and is small in size. The city of Brockton should implement remedial measures.
National Program for Inspection of Non-Federal Dams. Bigney Pond Dam (MA 00422), Massachusetts-Rhode Island Coastal Basin, Brockton, Massachusetts. Phase I, Inspection Report
Bigney Pond Dam is formed by an approximately 180 ft. length of earth embankment confined by vertical atone masonry retaining walls about 11 ft. high. The dam is in good condition. It has a low hazard potential and is small in size. The city of Brockton should implement remedial measures.
National Program for Inspection of Non-Federal Dams. Bigney Pond Dam (MA 00422), Massachusetts-Rhode Island Coastal Basin, Brockton, Massachusetts. Phase I, Inspection Report
1978
71 pages
Report
No indication
English