A platform for research: civil engineering, architecture and urbanism
Sand Overlaying for Sea Bottom Sediment Improvement by Conveyor Barge
As a feasibility survey for a pilot project for prevention of water pollution of the Seto Inland Sea, the 3rd District Port Construction Bureau of the Ministry of Transport conducted a series of sand overlaying tests of sludge in an area off Kure in the Hiroshima Bay in October 1979.
Sand Overlaying for Sea Bottom Sediment Improvement by Conveyor Barge
As a feasibility survey for a pilot project for prevention of water pollution of the Seto Inland Sea, the 3rd District Port Construction Bureau of the Ministry of Transport conducted a series of sand overlaying tests of sludge in an area off Kure in the Hiroshima Bay in October 1979.
Sand Overlaying for Sea Bottom Sediment Improvement by Conveyor Barge
H. Togashi (author)
1983
20 pages
Report
No indication
English
furniture - CONCEALING AND OVERLAYING
Online Contents | 2003
|Bearing capacity of strip footings on a reinforced sand overlaying soft clay
British Library Conference Proceedings | 2008
|400-Ft conveyor rides barge to place rock fill on levee
Engineering Index Backfile | 1964
|