A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. Monsanto Company Upper Dam (MA 00573), Connecticut River Basin, Springfield, Massachusetts. Phase 1 Inspection Report
This earthfill embankment dam is about 145 ft. long with a maximum height of about 12 ft. The project is considered to be in fair condition. The dam is small in size having a hazard potential of significant. The owner should employ a qualified engineer to conduct further studies to determine the measures that are necessary to improve discharge capacities. (Author).
National Program for Inspection of Non-Federal Dams. Monsanto Company Upper Dam (MA 00573), Connecticut River Basin, Springfield, Massachusetts. Phase 1 Inspection Report
This earthfill embankment dam is about 145 ft. long with a maximum height of about 12 ft. The project is considered to be in fair condition. The dam is small in size having a hazard potential of significant. The owner should employ a qualified engineer to conduct further studies to determine the measures that are necessary to improve discharge capacities. (Author).
National Program for Inspection of Non-Federal Dams. Monsanto Company Upper Dam (MA 00573), Connecticut River Basin, Springfield, Massachusetts. Phase 1 Inspection Report
1978
92 pages
Report
No indication
English