A platform for research: civil engineering, architecture and urbanism
Sacramento River Division: Central Valley Project
The Sacramento River Division through its Sacramento Canals Unit added two canals and a dam to the Central Valley Project (CVP). Begun in the 1950s, the Unit included the Corning Canal, Tehama-Colusa Canal and Red Bluff Diversion Dam. The Army Corps of Engineers finished building Black Butte Dam, as a separate project, in 1963. The Black Butte Integration Act of October 23, 1970, brought the dam and reservoir under the auspices of the Sacramento River Division as a the Black Butte Unit.
Sacramento River Division: Central Valley Project
The Sacramento River Division through its Sacramento Canals Unit added two canals and a dam to the Central Valley Project (CVP). Begun in the 1950s, the Unit included the Corning Canal, Tehama-Colusa Canal and Red Bluff Diversion Dam. The Army Corps of Engineers finished building Black Butte Dam, as a separate project, in 1963. The Black Butte Integration Act of October 23, 1970, brought the dam and reservoir under the auspices of the Sacramento River Division as a the Black Butte Unit.
Sacramento River Division: Central Valley Project
E. A. Stene (author)
1994
19 pages
Report
No indication
English
Shasta Division: Central Valley Project
NTIS | 1996
|Construction methods and costs Sacramento valley irrigation project
Engineering Index Backfile | 1915
|Corrugated-iron construction on the Sacramento valley irrigation project
Engineering Index Backfile | 1914
|Friant Dam. Friant Division Central Valley Project, California
Engineering Index Backfile | 1939