A platform for research: civil engineering, architecture and urbanism
Crystal Dam, Reservoir, and Power Plant, Curecanti Unit, Colorado River Storage Project
Construction is proposed of Crystal Dam and a hydroelectric powerlant on the Gunnison River, Montrose, Colorado. Adverse environmental effects include Inundation of 6.5 miles of trout fishery and high quality river scenery by a reservoir having a maximum depth of 200 feet at the dam, and unavoidable turbidity increases during the construction period.
Crystal Dam, Reservoir, and Power Plant, Curecanti Unit, Colorado River Storage Project
Construction is proposed of Crystal Dam and a hydroelectric powerlant on the Gunnison River, Montrose, Colorado. Adverse environmental effects include Inundation of 6.5 miles of trout fishery and high quality river scenery by a reservoir having a maximum depth of 200 feet at the dam, and unavoidable turbidity increases during the construction period.
Crystal Dam, Reservoir, and Power Plant, Curecanti Unit, Colorado River Storage Project
1971
53 pages
Report
No indication
English
Wayne Aspinall Unit: Colorado River Storage Project
NTIS | 2000
|Colorado River storage project
Engineering Index Backfile | 1950
Upper Colorado River project -- 1
Engineering Index Backfile | 1961
|