Trench Moisture-Barrier Technology. Third Quarterly Report, April 1-June 30, 1982 (Maxey Flats Site)
Primary emphasis of this project is on demonstrating the methods of design and field construction of a multilayered trench cover using available technology, and to monitor its long-term effectiveness in preventing infiltration of rainwater into radioactive waste disposal trenches. Project activities during this period included continuation of proof of installation concept tests; conclusion of the design contracting activity; continuation of literature review; and a study on the feasibility of obtaining and use of a wiped film evaporator/solidification system. (ERA citation 08:033198)
Trench Moisture-Barrier Technology. Third Quarterly Report, April 1-June 30, 1982 (Maxey Flats Site)
Primary emphasis of this project is on demonstrating the methods of design and field construction of a multilayered trench cover using available technology, and to monitor its long-term effectiveness in preventing infiltration of rainwater into radioactive waste disposal trenches. Project activities during this period included continuation of proof of installation concept tests; conclusion of the design contracting activity; continuation of literature review; and a study on the feasibility of obtaining and use of a wiped film evaporator/solidification system. (ERA citation 08:033198)
Trench Moisture-Barrier Technology. Third Quarterly Report, April 1-June 30, 1982 (Maxey Flats Site)
1982
23 pages
Report
No indication
English