A platform for research: civil engineering, architecture and urbanism
Trench Moisture Barrier Technology. Sixth Quarterly Report, January 1-March 31, 1983
Primary emphasis of the project was on demonstrating the methods of design and field construction of a multilayered trench cover using available technology, and to monitor its long-term effectiveness in preventing infiltration of rainwater into rad-waste disposal trenches. Project activities during this period included further work and observations in the proof of installation concept area. Additionally, discussions continued to be held with the Department of Energy on the possible re-direction of this grant as a result of knowledge learned while implementing the proof of installation concept design. (ERA citation 08:050748)
Trench Moisture Barrier Technology. Sixth Quarterly Report, January 1-March 31, 1983
Primary emphasis of the project was on demonstrating the methods of design and field construction of a multilayered trench cover using available technology, and to monitor its long-term effectiveness in preventing infiltration of rainwater into rad-waste disposal trenches. Project activities during this period included further work and observations in the proof of installation concept area. Additionally, discussions continued to be held with the Department of Energy on the possible re-direction of this grant as a result of knowledge learned while implementing the proof of installation concept design. (ERA citation 08:050748)
Trench Moisture Barrier Technology. Sixth Quarterly Report, January 1-March 31, 1983
1983
80 pages
Report
No indication
English