A platform for research: civil engineering, architecture and urbanism
Upper Willow Rehabilitation District: Lake Dredging and River Bank Stabilization Project
The report describes the hydraulic dredging of 18.4 acres of sediment from Upper Willow Reservoir, Wisconsin and the streambank stabilization of Willow River. This involved sloping, seeding, and riprap. A sediment trap was used to combat bedload sedimentation. The report also describes a watershed management plan that will help minimize erosion and nutrient loading.
Upper Willow Rehabilitation District: Lake Dredging and River Bank Stabilization Project
The report describes the hydraulic dredging of 18.4 acres of sediment from Upper Willow Reservoir, Wisconsin and the streambank stabilization of Willow River. This involved sloping, seeding, and riprap. A sediment trap was used to combat bedload sedimentation. The report also describes a watershed management plan that will help minimize erosion and nutrient loading.
Upper Willow Rehabilitation District: Lake Dredging and River Bank Stabilization Project
1983
59 pages
Report
No indication
English
Harland Creek Bendway Weir/Willow Post Bank Stabilization Demonstration Project
British Library Conference Proceedings | 1995
|Willow river irrigation project
Engineering Index Backfile | 1911
Case Study: Harland Creek Bendway Weir/Willow Post Bank Stabilization Demonstration Project
British Library Conference Proceedings | 1995
|Four Years Later, Harland Creek Bendway Weir/Willow Post Bank Stabilization Demonstration Project
British Library Conference Proceedings | 1998
|