A platform for research: civil engineering, architecture and urbanism
INL Sitewide Operations and Maintenance Report for CERCLA Response Actions--FY 2006. Idaho Cleanup Project
This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during Fiscal Year 2006. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document. Waste Area Groups 7 and 8 are not reported in this document. Waste Area Group 7 is an operating facility, and the status of its operations is reported directly to the regulatory agencies. Waste Area Group 8 is excluded from this report, because it falls outside the direct control of U.S. Department of Energy Idaho Operations Office. The INEEL Sitewide Institutional Controls Plan discusses the inspection, maintenance, repair, and reporting activities involving institutional controls at the Idaho National Laboratory Site. Therefore, the maintenance of institutional controls is not discussed in this report. The Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan provides a reference to support this report by providing current and projected facility and land uses and by listing the Comprehensive Environmental Response, Compensation, and Liability Act sites.
INL Sitewide Operations and Maintenance Report for CERCLA Response Actions--FY 2006. Idaho Cleanup Project
This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during Fiscal Year 2006. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document. Waste Area Groups 7 and 8 are not reported in this document. Waste Area Group 7 is an operating facility, and the status of its operations is reported directly to the regulatory agencies. Waste Area Group 8 is excluded from this report, because it falls outside the direct control of U.S. Department of Energy Idaho Operations Office. The INEEL Sitewide Institutional Controls Plan discusses the inspection, maintenance, repair, and reporting activities involving institutional controls at the Idaho National Laboratory Site. Therefore, the maintenance of institutional controls is not discussed in this report. The Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan provides a reference to support this report by providing current and projected facility and land uses and by listing the Comprehensive Environmental Response, Compensation, and Liability Act sites.
INL Sitewide Operations and Maintenance Report for CERCLA Response Actions--FY 2006. Idaho Cleanup Project
2006
36 pages
Report
No indication
English
Radioactive Wastes & Radioactivity , Solid Wastes Pollution & Control , Radiation Pollution & Control , Idaho Nuclear Laboratory , Radioactive waste management , Site characteristics , Radioactive waste facilities , Radioactive waste disposal , Land uses , Cleaning , Inspection , Maintenance , Repair , Control systems , Waste treatment , Hazardous materials , Regulations