A platform for research: civil engineering, architecture and urbanism
INL Sitewide Institutional Controls Annual Report--FY2006. Idaho Cleanup Project
This document reports the results of the fiscal year 2006 institutional controls assessment at Comprehensive Environmental Response, Compensation, and Liability Act sites at the Idaho National Laboratory. These activities are described in the INEEL Sitewide Institutional Controls Plan. Inspections were performed by Long-term Stewardship Program personnel with representatives of the various facilities. The assessments showed that the various institutional control measures in place across the Idaho National Laboratory Site are functioning as intended. Information in the Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan was reviewed as part of the annual assessment and was revised as needed to reflect the current status of the institutional control sites.
INL Sitewide Institutional Controls Annual Report--FY2006. Idaho Cleanup Project
This document reports the results of the fiscal year 2006 institutional controls assessment at Comprehensive Environmental Response, Compensation, and Liability Act sites at the Idaho National Laboratory. These activities are described in the INEEL Sitewide Institutional Controls Plan. Inspections were performed by Long-term Stewardship Program personnel with representatives of the various facilities. The assessments showed that the various institutional control measures in place across the Idaho National Laboratory Site are functioning as intended. Information in the Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan was reviewed as part of the annual assessment and was revised as needed to reflect the current status of the institutional control sites.
INL Sitewide Institutional Controls Annual Report--FY2006. Idaho Cleanup Project
2006
25 pages
Report
No indication
English