A platform for research: civil engineering, architecture and urbanism
Brief Reconnaissance Study for the Addition of Hydropower for Anderson Creek Dam, Cartecay, Georgia
The feasibility of retrofitting the Anderson Creek Dam near Cartecay, GA for power generation was examined. This dam has a developable head of 24 ft. and was built in 1963 for flood control. The study of environmental, institutional, safety, and economic factors showed that this site might be suitable for a do-it-yourself installation of a micro-hydro unit, but it is not feasible for the commercial development of hydroelectric power. (ERA citation 07:046135)
Brief Reconnaissance Study for the Addition of Hydropower for Anderson Creek Dam, Cartecay, Georgia
The feasibility of retrofitting the Anderson Creek Dam near Cartecay, GA for power generation was examined. This dam has a developable head of 24 ft. and was built in 1963 for flood control. The study of environmental, institutional, safety, and economic factors showed that this site might be suitable for a do-it-yourself installation of a micro-hydro unit, but it is not feasible for the commercial development of hydroelectric power. (ERA citation 07:046135)
Brief Reconnaissance Study for the Addition of Hydropower for Anderson Creek Dam, Cartecay, Georgia
T. G. Gebhard (author)
1982
19 pages
Report
No indication
English