A platform for research: civil engineering, architecture and urbanism
Brief Reconnaissance Study for the Addition of Hydropower for Riegel Dam, Trion, Georgia
The feasibility of retrofitting the Riegel Dam near Trion, Georgia for power generation was examined. This dam has a developable head of 17 ft., was built in 1900 for supplying hydroelectric power for a textile mill, and currently provides cooling water to the mill. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site would require new generating equipment and that such retrofitting appears to be economically feasible. (ERA citation 07:046120)
Brief Reconnaissance Study for the Addition of Hydropower for Riegel Dam, Trion, Georgia
The feasibility of retrofitting the Riegel Dam near Trion, Georgia for power generation was examined. This dam has a developable head of 17 ft., was built in 1900 for supplying hydroelectric power for a textile mill, and currently provides cooling water to the mill. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site would require new generating equipment and that such retrofitting appears to be economically feasible. (ERA citation 07:046120)
Brief Reconnaissance Study for the Addition of Hydropower for Riegel Dam, Trion, Georgia
T. G. Gebhard (author)
1982
19 pages
Report
No indication
English