A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. Murray Printing Company Dam (MA 00130), Merrimack River Basin, Westford, Massachusetts. Phase I Inspection Report
The dam consists of a stone masonry main spillway with flashboards and an adjacent canal inlet structure. The 76 ft. long dam has a main spillway about 40 ft. in length. The maximum height of the dam is estimated to be 9.3 ft. The dam is confirmed to have a 'significant' hazard potential. The dam is said to be in good condition. The test flood for this dam is 1/2 the PMF. (Author)
National Program for Inspection of Non-Federal Dams. Murray Printing Company Dam (MA 00130), Merrimack River Basin, Westford, Massachusetts. Phase I Inspection Report
The dam consists of a stone masonry main spillway with flashboards and an adjacent canal inlet structure. The 76 ft. long dam has a main spillway about 40 ft. in length. The maximum height of the dam is estimated to be 9.3 ft. The dam is confirmed to have a 'significant' hazard potential. The dam is said to be in good condition. The test flood for this dam is 1/2 the PMF. (Author)
National Program for Inspection of Non-Federal Dams. Murray Printing Company Dam (MA 00130), Merrimack River Basin, Westford, Massachusetts. Phase I Inspection Report
1979
76 pages
Report
No indication
English