POL Pier Repairs Lajes Field, Azores Construction Inspection Visit Number 2
This report discusses the problems involved in the construction and repair to the piers at Lajes Field. The contractor required an extension of the 100-day shutdown period and penalties would have to be applied because the base would be too low on fuel. Inspection topics included: Rock anchorages, Pile tie down at loading platform, Epoxy pressure grout repairs - Loading platform, Harbor bottom elevations, New north and south dolphin structures, and Approachway concrete spalling.
POL Pier Repairs Lajes Field, Azores Construction Inspection Visit Number 2
This report discusses the problems involved in the construction and repair to the piers at Lajes Field. The contractor required an extension of the 100-day shutdown period and penalties would have to be applied because the base would be too low on fuel. Inspection topics included: Rock anchorages, Pile tie down at loading platform, Epoxy pressure grout repairs - Loading platform, Harbor bottom elevations, New north and south dolphin structures, and Approachway concrete spalling.
POL Pier Repairs Lajes Field, Azores Construction Inspection Visit Number 2
1980
65 pages
Report
No indication
English
Civil Engineering , Logistics Military Facilities & Supplies , Inspection , Waterfront structures , Azores , Bottom , Concrete , Elevation , Epoxy compounds , Fuels , Grout , Harbors , Piers , Platforms , Pol storage , Pressure , Repair , Spallation , Structures , Air force facilities , Underwater , Underwater inspection , Dolphins(Structures) , Lajes Field
Engineering Index Backfile | 1928
|British Library Conference Proceedings | 1998
|Charneiras Plasticas em Lajes Retangulares de Pontes
UB Braunschweig | 1965
|