A platform for research: civil engineering, architecture and urbanism
Final Environmental Assessment Addressing a Proposed Airfield Drainage Improvement Project, Dobbins Air Reserve Base, Georgia
Dobbins ARB is proposing to repair the existing airfield stormwater system. The Proposed Acton is required because the current stormwater system has exceeded its design useful life cycle. The purpose of the Proposed Action is to repair and improve stormwater drainage and minimize the attraction of birds to the airfield of a mission critical military installation.
Final Environmental Assessment Addressing a Proposed Airfield Drainage Improvement Project, Dobbins Air Reserve Base, Georgia
Dobbins ARB is proposing to repair the existing airfield stormwater system. The Proposed Acton is required because the current stormwater system has exceeded its design useful life cycle. The purpose of the Proposed Action is to repair and improve stormwater drainage and minimize the attraction of birds to the airfield of a mission critical military installation.
Final Environmental Assessment Addressing a Proposed Airfield Drainage Improvement Project, Dobbins Air Reserve Base, Georgia
2013
93 pages
Report
No indication
English
Airfield drainage structure investigation : final report
TIBKAT | 1949
|Closure to “O'Connor-Dobbins on Reaeration”
ASCE | 2021
|Urban Design and People (Michael Dobbins)
British Library Online Contents | 2010
|