A platform for research: civil engineering, architecture and urbanism
This memorandum discusses the roflanging of the corroded rear Van Stone flanges at the B Pile after cutting 3/8-inch off the rear gun barrel which should place the B Pile in a condition as good as, or better than that of the D or F Piles.
This memorandum discusses the roflanging of the corroded rear Van Stone flanges at the B Pile after cutting 3/8-inch off the rear gun barrel which should place the B Pile in a condition as good as, or better than that of the D or F Piles.
Process tubes at B Pile
W. R. Lewis (author)
1947
2 pages
Report
No indication
English
Severe pitting attack of pile process tubes and slugs
NTIS | 1953
|Novel PHC energy tubular pile with heat exchange tubes arranged outside pile body
European Patent Office | 2024
|GFRP tubes for pile/column applications for bridges
Tema Archive | 2001
|Composite pile formed of interconnected rigid hollow tubes
European Patent Office | 2018
|Composite pile formed of interconnected rigid hollow tubes
European Patent Office | 2015
|