Hanford Engineering Works monthly report, December 1946. Deletion
This report covers activities for the month of December 1946 at Hanford Engineer works. The power levels of the Piles at 100 D and 100 F were maintained at 250 megawatts (MW) and 200 MW respectively. The operating time efficiency was 93.5. Forty-seven batches were started in the Canyon Buildings and fifty-seven were delivered from the Isolation Building. There were no major injuries during December. The plant safety record as of December 31 was seventy-seven days. On December 2 Dormitory W-10 was dedicated to the Educational Program of the Hanford Engineer Works. Plans have been completed for the installation of the General Electric Company procedures in place of the du Pont procedures that were retained in effect after the September 1 transfer. The new procedures will become effective as of January 1.
Hanford Engineering Works monthly report, December 1946. Deletion
This report covers activities for the month of December 1946 at Hanford Engineer works. The power levels of the Piles at 100 D and 100 F were maintained at 250 megawatts (MW) and 200 MW respectively. The operating time efficiency was 93.5. Forty-seven batches were started in the Canyon Buildings and fifty-seven were delivered from the Isolation Building. There were no major injuries during December. The plant safety record as of December 31 was seventy-seven days. On December 2 Dormitory W-10 was dedicated to the Educational Program of the Hanford Engineer Works. Plans have been completed for the installation of the General Electric Company procedures in place of the du Pont procedures that were retained in effect after the September 1 transfer. The new procedures will become effective as of January 1.
Hanford Engineering Works monthly report, December 1946. Deletion
1947
164 pages
Report
No indication
English
Hanford Works monthly report, February 1948
NTIS | 1948
Hanford Works monthly report, March 1948
NTIS | 1948