A platform for research: civil engineering, architecture and urbanism
Location Approval Project S-681-K, Etowah County, Additional Bridge Across Coosa River Between Rainbow City and Southside, Alabama
The proposed Project S-681-K, Etowah County Alabama, is more or less a bridge project across the Coosa River between Southside and Rainbow City. The project begins in Southside on Alabama State Route 77, 2100' south of the Coosa River and runs in a northerly direction on new location crossing the Coosa River west of the present bridge crossing on Alabama 77; thence continue in a northerly direction tying back into Alabama 77 approximately 3100' north of the Coosa River. It is proposed to construct one 24' roadway with two 12' traffic lanes and one bridge across the Coosa River. In addition, it is proposed to construct a service road connecting a driveway and a connector road for a paved county road to the new southbound lane near the beginning of the project and another connector road on the north side of the Coosa River connecting Rainbow Marina Drive with the new southbound lane. The total length of the project excluding service and connector roads is approximately 1.2 miles with a total estimated construction and right of way cost of approximately $5,374,510, including service and connector roads. Environmental impacts include land acquisition, relocation of families and businesses, and traffic safety.
Location Approval Project S-681-K, Etowah County, Additional Bridge Across Coosa River Between Rainbow City and Southside, Alabama
The proposed Project S-681-K, Etowah County Alabama, is more or less a bridge project across the Coosa River between Southside and Rainbow City. The project begins in Southside on Alabama State Route 77, 2100' south of the Coosa River and runs in a northerly direction on new location crossing the Coosa River west of the present bridge crossing on Alabama 77; thence continue in a northerly direction tying back into Alabama 77 approximately 3100' north of the Coosa River. It is proposed to construct one 24' roadway with two 12' traffic lanes and one bridge across the Coosa River. In addition, it is proposed to construct a service road connecting a driveway and a connector road for a paved county road to the new southbound lane near the beginning of the project and another connector road on the north side of the Coosa River connecting Rainbow Marina Drive with the new southbound lane. The total length of the project excluding service and connector roads is approximately 1.2 miles with a total estimated construction and right of way cost of approximately $5,374,510, including service and connector roads. Environmental impacts include land acquisition, relocation of families and businesses, and traffic safety.
Location Approval Project S-681-K, Etowah County, Additional Bridge Across Coosa River Between Rainbow City and Southside, Alabama
1973
54 pages
Report
No indication
English
Coosa River Navigation, Georgia and Alabama
NTIS | 1972
Constructing Mitchell dam on the Coosa river (Alabama)
Engineering Index Backfile | 1923
|Lock 12 development of the Alabama power company, coosa river, Alabama
Engineering Index Backfile | 1914