A platform for research: civil engineering, architecture and urbanism
Enclosed firing facility NTS Holmes and Narver report - HN 104-1021C
This report discusses the design and budget requirements for an enclosed firing facility. The use of a steel sphere installed in a tunnel facility is recommended. The system would incorporate handling equipment, ventilation, refrigeration and ice handling.
Enclosed firing facility NTS Holmes and Narver report - HN 104-1021C
This report discusses the design and budget requirements for an enclosed firing facility. The use of a steel sphere installed in a tunnel facility is recommended. The system would incorporate handling equipment, ventilation, refrigeration and ice handling.
Enclosed firing facility NTS Holmes and Narver report - HN 104-1021C
W. B. Crowley (author)
1958
14 pages
Report
No indication
English