Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Enclosed firing facility NTS Holmes and Narver report - HN 104-1021C
This report discusses the design and budget requirements for an enclosed firing facility. The use of a steel sphere installed in a tunnel facility is recommended. The system would incorporate handling equipment, ventilation, refrigeration and ice handling.
Enclosed firing facility NTS Holmes and Narver report - HN 104-1021C
This report discusses the design and budget requirements for an enclosed firing facility. The use of a steel sphere installed in a tunnel facility is recommended. The system would incorporate handling equipment, ventilation, refrigeration and ice handling.
Enclosed firing facility NTS Holmes and Narver report - HN 104-1021C
W. B. Crowley (Autor:in)
1958
14 pages
Report
Keine Angabe
Englisch