This progress report discusses activities at P Division for the month of March, 1949. All piles operated at 275 megawatts throughout the month except for the outages listed under Area Activities in this report. The average ''time operating efficiency''was 91.4%. A total of 47 tons of metal was discharged from the piles during the month. During the month, 16.6 tons of alpha-rolled, triple-dipped metal were discharged without difficulty at a nominal concentration of 320 megawatts day (MWD) per ton. Inspection of selected tubes of this material indicated that exposures at this level are satisfactory. In view of these results the programs of stepwise increases in concentration will be continued, with the next test tonnages being discharged at a nominal concentration of 360 MWD per ton. The nominal monthly production rate of acceptable canned pieces was reduced from 90 tons to 60 tons on March 28. This curtailment of production was possible in view of the favorable inventory of slugs available for charging DR and H piles.
This progress report discusses activities at P Division for the month of March, 1949. All piles operated at 275 megawatts throughout the month except for the outages listed under Area Activities in this report. The average ''time operating efficiency''was 91.4%. A total of 47 tons of metal was discharged from the piles during the month. During the month, 16.6 tons of alpha-rolled, triple-dipped metal were discharged without difficulty at a nominal concentration of 320 megawatts day (MWD) per ton. Inspection of selected tubes of this material indicated that exposures at this level are satisfactory. In view of these results the programs of stepwise increases in concentration will be continued, with the next test tonnages being discharged at a nominal concentration of 360 MWD per ton. The nominal monthly production rate of acceptable canned pieces was reduced from 90 tons to 60 tons on March 28. This curtailment of production was possible in view of the favorable inventory of slugs available for charging DR and H piles.
P Division monthly report, March 1949
E. P. Lee (author)
1949
10 pages
Report
No indication
English
P Division monthly report, June 1949
NTIS | 1949
|P Division monthly report, May 1949
NTIS | 1949
|P Division monthly report, July 1949
NTIS | 1949
|P Division monthly report, October 1949
NTIS | 1949
|P Division monthly report, September 1949
NTIS | 1949
|