A platform for research: civil engineering, architecture and urbanism
This progress report discusses activities at the P Division for the month of October 1949. The B and F piles operated at 275 megawatts (MW) and the D pile at 305 MW throughout the month except for outages listed under Area Activities. ''Time Operated'' efficiency for the three piles was 92.8%. This is the highest operating efficiency since February, 1946. A total of 59.69 tons of metal, at an average concentration of 388 MWD/ton, was discharged from the piles during the month. The H pile was charged and activated during the month. Actual operation began on October 20 and the schedule of tests outlined in HW-14638 had been completed by month end. Operating level at the end of the month was 100 MW.
This progress report discusses activities at the P Division for the month of October 1949. The B and F piles operated at 275 megawatts (MW) and the D pile at 305 MW throughout the month except for outages listed under Area Activities. ''Time Operated'' efficiency for the three piles was 92.8%. This is the highest operating efficiency since February, 1946. A total of 59.69 tons of metal, at an average concentration of 388 MWD/ton, was discharged from the piles during the month. The H pile was charged and activated during the month. Actual operation began on October 20 and the schedule of tests outlined in HW-14638 had been completed by month end. Operating level at the end of the month was 100 MW.
P Division monthly report, October 1949
E. P. Lee (author)
1949
11 pages
Report
No indication
English
P Division monthly report, June 1949
NTIS | 1949
|P Division monthly report, May 1949
NTIS | 1949
|P Division monthly report, July 1949
NTIS | 1949
|P Division monthly report, September 1949
NTIS | 1949
|P Division monthly report, March 1949
NTIS | 1949
|