A platform for research: civil engineering, architecture and urbanism
Pavement Edge Treatment: Post Construction Report, Experimental Feature WA 11-01
Four projects were built over two construction seasons using special devices attached to the paving machine that produces a 30O slope on the outside pavement edge instead of the near vertical drop-off common with conventional paving equipment. This pavement edge treatment allows vehicles that leave the roadway a gentler slope to navigate when remounting the pavement. The projects used four types of devices; (1) the TransTech Shoulder Wedge Maker, (2) the Advant-EdgeTM, (3) the Carlson Safety Edge End Gate, and (4) a contractor built device. All of the devices were able to produce a finished pavement slope that was close to the 30O angle recommended by FHWA. The projects will be monitored for five years to measure the functional performance of the edge treatment and possible reductions in collisions caused by drivers trying to re-enter the roadway after losing control and running off the road.
Pavement Edge Treatment: Post Construction Report, Experimental Feature WA 11-01
Four projects were built over two construction seasons using special devices attached to the paving machine that produces a 30O slope on the outside pavement edge instead of the near vertical drop-off common with conventional paving equipment. This pavement edge treatment allows vehicles that leave the roadway a gentler slope to navigate when remounting the pavement. The projects used four types of devices; (1) the TransTech Shoulder Wedge Maker, (2) the Advant-EdgeTM, (3) the Carlson Safety Edge End Gate, and (4) a contractor built device. All of the devices were able to produce a finished pavement slope that was close to the 30O angle recommended by FHWA. The projects will be monitored for five years to measure the functional performance of the edge treatment and possible reductions in collisions caused by drivers trying to re-enter the roadway after losing control and running off the road.
Pavement Edge Treatment: Post Construction Report, Experimental Feature WA 11-01
K. W. Anderson (author) / T. Berends (author) / M. Russell (author) / J. S. Uhlmeyer (author) / J. Weston (author)
2013
50 pages
Report
No indication
English
Pavement Edge Treatment, Final Report
NTIS | 2018
|Roadbed edge protection equipment during pavement construction
European Patent Office | 2023
|